InnerWeb
Skip to main content

FAQ: Shift Work in a Print Shop, Missed Exit Scans and Working Hours on the Attendance List

A print shop supervisor who runs shift work asks the same questions after the first night on a new system: what happens when someone forgets to scan out, whether they disappear from the attendance list, and what happens to their working hours. The answers below are based on how the evacuation list and working-time accounting on a work permit work in InnerWeb.

12 h
threshold for an entry without an exit scan before the Uncertain tab
Source: evacuation list feature sheet
13 s
evacuation list refresh interval
Source: evacuation list feature sheet
6
groups on the list printout
Source: evacuation list feature sheet

A forgotten exit scan: what the system does

The first question is always the same: does a person without an exit scan still count as present on site? The answer is cautious by design. An entry without an exit scan that is older than 12 hours goes to the Uncertain tab of the evacuation list, and the automatic check-out runs every 3 hours.

This means the system does not guess whether someone left through the gate during a shift handover. It separates people who are certainly on site from people for whom there is no recent information. For a shift supervisor, that distinction is more useful than hiding the entry, because it leaves a trace to resolve in the morning.

Does a person without a scan disappear from the list after 12 hours?

No. They move to a different place on the list. The Uncertain tab collects entries older than 12 hours with no exit scan, so the person remains visible to the evacuation coordinator. This is intentional: the evacuation list should show too many people rather than too few, because a person missing from the list is someone nobody looks for during a fire.

What about a guest or courier who leaves after the gate shift change?

A person already on site can always leave, even if their declaration, training or permit is no longer valid today. This rule protects the list from the opposite error: a person stopped by an exit block would stay on site and on the list even though they want to leave.

The evacuation list during the night shift

The evacuation list shows who is on site right now, refreshes every 13 seconds and prints one page per group. There are six groups: guests, couriers, suppliers, employees, external companies and uncertain. The night shift supervisor therefore does not have to put together a paper list from several registers, because the printout reflects the current state.

In a print shop with shift work, the list changes its composition two or three times a day, and the most uncertain entries usually appear right after the handover, when some people leave as a group. It is worth printing a test list after the shift change to see how many people remain in the Uncertain tab.

  • Guests: people visiting for meetings and print pick-ups.
  • Couriers and suppliers: people with a short stay, most often at the loading ramp.
  • Employees: people with an internal account.
  • External companies: service crews and contractors.
  • Uncertain: entries older than 12 hours with no exit scan.

Time thresholds in handling a missing exit scan

Time thresholds in handling a missing exit scanBar chart: automatic check-out every 3 hours, Uncertain tab threshold after 12 hours.02.557.51012.5hAutomatic check-out cycle: 3 h3 hAutomatic check-out cycleUncertain tab threshold: 12 h12 hUncertain tab threshold
Source: Description of the InnerWeb evacuation list feature

Working time of a service crew after the night

The second group of questions concerns the hours of external crews working on a permit through the night. The working time of a person on a permit is counted from joining, or starting with location, until the end of their work, the closing of the permit, the expiry of the term, or the daily cutoff at 04:00. After the cutoff, the worker lists are restored as invited, so a person who keeps working must join again.

For accounting, this means continuous night work is recorded in two segments: up to 04:00 and from the moment of rejoining. The maintenance manager should not treat this as an error. It is a way to separate calendar days and to prevent a situation in which time is counted for a person who left long ago.

What to do in the morning after the night shift

The morning routine takes a few minutes if it is agreed in advance. The shift supervisor opens the Uncertain tab and compares it with the staffing they know from the gate. People who left without a scan are checked out manually or left for the automatic check-out, which runs every 3 hours.

For each person in the Uncertain tab, it is good practice to record the reason, for example a group exit, a reader failure or a forgotten scan. After a month, such notes show a pattern: if most missed exits concern one gate, the problem lies in the station setup, not in the people.

  • Open the Uncertain tab right after the shift handover.
  • Compare it with the staffing and the list of service crews on permits.
  • Record the reason for each missed scan.
  • Check whether a crew that worked after 04:00 has rejoined the permit.

Questions about boundaries and responsibility

The last group of questions concerns whether the list is evidence. The evacuation list is an operational tool that provides audit evidence of who was recorded as present at a given moment. It does not replace the evacuation procedure or the headcount at the assembly point; it supports them.

InnerWeb is a software producer and does not supply readers. The exit scan comes from a workstation or access control system that the plant already has, and card swipes are received from that system and linked with attendance. If a gate exit does not generate an event, the first symptom will appear in the Uncertain tab.

Video

Frequently asked questions

Does the evacuation list need to be refreshed manually?

No. The list refreshes every 13 seconds, so a printout made during a drill or an incident shows the current state, not the state from the start of the shift.

Does the Uncertain tab mean that someone is certainly still in the plant?

No. It means there is no recent information about an exit. For the evacuation coordinator it is a signal to check that person, not a conclusion that they are on site.

What about the hours of a crew that works after 04:00?

Time is counted up to the 04:00 cutoff, and after it the worker list is restored as invited. The crew rejoins and the time is counted again, in the second segment.

Does InnerWeb supply exit gates and readers?

No. InnerWeb supplies software and receives card swipes from the plant's existing access control system, linking them with attendance and permits.

Let us look at the attendance list for your shifts

We will show the evacuation list and working-time accounting on sample data and agree how to set up the morning review of the Uncertain tab.

Let's talk