InnerWeb
Skip to main content

Level names and warehouse map labels: best practices

Map labels are read on the move, on a small screen, often in a hurry. A good name for a building, level and zone shortens the dispatcher's reaction time, while a bad one blurs into a smudge. Below are rules based on when and how the map editor shows names.

16
zoom level from which building names are visible
Source: documentation of the map editor
12
floor buttons visible at once
Source: documentation of the map editor

When a label is visible

Building names appear on the map from zoom level 16. Below that only the name of the view is shown, that is the whole site or hall, and the names of individual buildings are hidden so they do not cover the map. Inside a building the names are always visible.

Only an area with an outline and a height, that is an object with volume that you can enter with a double click, receives a name on the map. A zone without an outline gets no external label. This rule determines what is worth naming at all: volumes, not every fragment of the floor.

Rules for naming buildings

A building name must fit inside its outline at zoom level 16. A warehouse covering several thousand square metres has plenty of room, but a small technical building does not.

Use one convention across the whole site. If one building is called Warehouse A, another should not be called Hall number two. Names with two parts, a letter and a function, are readable and short: A High-bay storage, B Docks.

  • About 12 to 16 characters at most for the external name.
  • No abbreviations known only to one department.
  • No dates or version numbers in the name.
  • Polish characters are allowed, but consistently across the whole map.

Name readability vs. its length (example assessment)

Name readability vs. its length (example assessment)Bar chart: recommended name length 14 characters, limit 20, names that are too long 32 characters.010203040charactersRecommended: 14 characters14RecommendedReadability limit: 20 characters20Readability limitToo long: 32 characters32Too long
Source: Example calculation: assumption of 12-16 characters for an external name

Rules for naming levels

The floor selector shows buttons only for a building with at least two floors, and the labels in the Polish version are P, 1, 2. If the facility has a mezzanine, an attic or an underground level, agree whether and how you mark them before you start entering data.

Above 12 floors the selector shows a window of 12 buttons with arrows and mouse wheel scrolling, so in very tall facilities the level names should be short, ideally just numbers.

Zones and lines: names for people, not for the system

In single-hall mode we have a hall, a zone inside it and a production line. Zone names inside a building are always visible, so it is they that save readability when someone zooms in to check where exactly an event is.

A good zone name answers the question: where is this for a person standing in the hall? Picking north is better than K-07, because the shift supervisor does not have to explain the code to a new employee.

Labels and the data attached to them

The editor lets you assign risks to a building level, and the permit control and the dispatch centre later use the structure from the map. A name therefore appears in many places: on the map, in a permit, in a message for the dispatcher. Changing a name after go-live has consequences in each of them.

Before entering names, hold a short review with the person who will write the permits and with the dispatcher. If both people understand the name in the same way, the name is good.

Checklist

Video

Frequently asked questions

From which zoom level are building names visible?

From level 16. Below that you see only the name of the view, and inside a building the names are always visible.

Which objects get a name on the map?

Only an area with an outline and a height, that is an object with volume that you can enter with a double click.

Can a name be changed after go-live?

Yes, but the name is used in permits and dispatcher messages, so the change must be announced to the users.

Let's review your names on the map

We will show how labels look at different zoom levels and help you agree a convention for your site.

Let's talk