Induction training scenario: steps and test

Induction training for a new production employee can be run as a sequence of materials with one test, or as a scenario of steps with randomised questions. This guide shows when to choose which variant, how to build the steps and the pass threshold, and how to record the result so that it serves as evidence for audit.

5 steps
in the example training scenario
Source: example configuration
84
different sets of 3 questions from a pool of 9
Source: sample calculation

Two ways of running the training

The system allows the training to be run in two ways. It can be a sequence of materials (video and PDF) with one final test, or a scenario of steps with randomised questions and a required number of correct answers. The choice depends on what you want to demonstrate and how sensitive the topic is.

A sequence of materials with one test suits general content where you check understanding of the whole: rules of entry, evacuation routes, behaviour during an alarm. A scenario of steps checks each fragment in turn and does not let the person move on without understanding it, so it fits better topics where skipping a fragment has consequences.

How to build the steps of a scenario

It is worth building the steps by one rule: one step, one decision the employee must be able to make. Instead of one long video about everything, better are short blocks, each ending with a few questions.

In a scenario a failed step repeats a fragment of the material, and the final result is recorded only after all steps are passed. This principle affects the design: if a step is long, the repeat is tedious and discouraging. A short step cuts the repeat to a few minutes.

  • One step = one topic and one decision of the employee.
  • A step ends with a pool of questions from which the system draws a subset.
  • A failed step repeats only its own fragment, not the whole training.
  • The result is recorded after all steps are passed.

Example structure of a scenario

An example scenario for a new person may have five steps: rules of entry and the badge, evacuation routes and assembly points, reporting incidents, alarm and stillness, and the rules on the floor. Each step has a pool of nine questions, from which three are drawn, and passing a step requires two correct answers. This is a sample configuration to show the mechanics, not a pattern required by the system or by regulations.

Sample pass threshold: correct answers per step

Sample pass threshold: correct answers per stepBar chart: a pool of 9 questions, 3 drawn, 2 required correct answers in a sample step.0246810questionsQuestion pool: 9 questions9Question poolDrawn: 3 questions3DrawnRequired correct: 2 questions2Required correct
Source: Sample configuration to show the mechanics; not a requirement of the system or of regulations

Drawing questions and shuffling answers

Shuffling the order of answers in the test is on by default; every start of the training is a new attempt with a new order. This has a practical effect: a person who failed a step does not learn the position of the correct answer, only its content, and a colleague sitting next to them sees a different order than they do.

Drawing questions from the pool works as a complement. The larger the pool relative to the number of questions in a step, the smaller the chance that two people get the same set. A pool of nine questions with three drawn gives, in the example, 84 different sets of three questions, which is enough to limit copying from each other on the tablet.

Pass threshold and audit evidence

The pass threshold is set by the plant, together with the occupational safety service, and should match the weight of the topic. In the example the threshold is two correct out of three in each step. For critical topics all correct answers can be required, for general rules fewer.

The evidence is the record of the passed training, which is created after all steps are passed. The system supports showing that the person was trained before being admitted to work, but the compliance of the content with regulations is confirmed by the plant. When creating a work permit, the system automatically checks the qualifications of the assigned employees and warns in advance before medical checks and trainings expire, so the training record has further use than a single pass.

Video

Frequently asked questions

Is the result recorded after each step?

No. In a training scenario the final result is recorded only after all steps are passed.

What happens when someone fails a step?

The failed step repeats its fragment of the material. The person does not start the whole training from the beginning.

Is the order of answers fixed?

By default not: shuffling is on, and every start of the training is a new attempt with a new order.

Are the numbers in the example a requirement?

No. A pool of 9, drawing 3 and a threshold of 2 is a sample configuration. The threshold and scope are set by the plant.