Principle: one path, one link
The guide rests on a simple assumption: the new person gets one link and one path. The invitation creates an inactive account with an empty password and sends a single e-mail with one activation link. The link has the address of the instance with the fragment account/start, an identifier and a token, and the system itself decides where it leads the person after it is opened.
Thanks to this HR does not run three separate processes (account, training, password), but one path, on which it controls the result of each stage. Below are six steps, each with one check question.
Steps 1 and 2: preparing the account and sending the invitation
Step one is the person's data with the correct account language and contact channel. The language decides the training: mandatory training is selected according to the account language, and when only the Polish material is active, an account with another language goes to the password without the induction training. With a larger wave of invitations, it is accounts in other languages that are easiest to overlook, so the language is checked before sending.
Step two is the invitation itself. Before sending to the group it is worth opening a test link: the token stays valid for 7 days, and simply opening the link does not use it up. After sending, read the channel from the response: e-mail or SMS means confirmed sending, no channel means an account without delivery, so the operator hands over the link in person.
- Check question for step 1: is an active training available for this person's language?
- Check question for step 2: which channel did the invitation response give?
Steps 3 and 4: training and password
After the link is opened, if mandatory training is waiting, the person completes it as the first thing, and sets the password only after it. This is the reverse of the order in many plants, where the password is given first and training is often postponed. Here the training is the condition for reaching the password.
The training can be a sequence of materials (video and PDF) with one final test, or a scenario of steps with randomised questions. After the password is set, the system signs the person in automatically and the sign-in ends on the main page; when two-factor authentication is required, a sign-in form is shown.
Check after training
An invited account that has completed the training but has not set a password is let through the gate as active, and in the lists it has the status No password. This status is a list to review on Friday: the person is authorised to enter, but may be unable to sign in. Clicking the link again after activation without a password ends on the sign-in screen, which has no password field, so such a person needs help from the operator.
Network check
The induction training player uses external video services in the browser; behind the plant firewall the symptom is an endless loading wheel instead of an error message. If some people take the training at the plant, this must be checked on the same device.
Step 5: badge and team
The QR badge has one code for four uses: a check at the gate, the invitation, a check on the floor and sign-in to the training. Scanning on the training tablet does not sign in by itself: the screen shows whom the code belongs to, and the training starts after a person confirms it. There is no form with a company and login at all, because typing someone else's login would be an error rather than a convenience.
A team groups the people responsible for parts of the plant: it has areas (halls, lines, locations from the map tree), members, roles in works and categories of reports. Teams decide who is assigned and notified in permits, reports and location alarms. Assigning the new person to a team before the first shift means the right supervisor knows about them.
Step 6: first shift and audit evidence
On the start day the shift manager checks three things: whether the account has a status other than No password, whether the badge works at the gate, and whether the person is in the team of the right area. If any answer is no, it is a task for Friday, not for Monday morning.
The audit evidence consists of: the record of the completed training with its result, the account history and the assignment to a team. The system supports showing that the person was trained before being admitted to work, but the scope of the training and its compliance with regulations is confirmed by the plant.
- The account does not have the status No password.
- The QR badge passes the gate.
- The person belongs to the team of the right area.
- The training result is recorded.
Video
Frequently asked questions
Where to start when there are many new people?
From a list with the account language and contact channel, then a test link and only then sending. There is no mass import, so accounts are entered one by one, roughly 2 seconds per account on the system side.
Is scanning the badge enough to sign in?
No. The scan on the tablet shows whom the code belongs to, and the training starts after a person confirms it.
What is recorded as evidence?
The record of the completed training, the account history and the assignment to a team. The scope of the training is assessed on the plant side.
Let's guide the new person without a block
We will show the whole path on an example from your plant: from the invitation, through training, to the badge and the team.
Let's talk