What the cost of classroom induction training consists of
The cost of classroom training is not only instructor hours. It includes the time of participants who are not working in that time, organising the group (waiting for a full set of people), preparing the room and repeat sessions for late and absent people.
The largest item is usually invisible in the training budget: the unproductive first day. The new person is already employed, but until the training is passed they cannot take up the workstation. For the shift manager this means a gap in staffing, and for HR a queue for signatures.
- Instructor time for running the session and preparing the room.
- Participant time: employment hours without work at the workstation.
- Delay in starting at the workstation until the training is passed.
- Repeat sessions for people who are late or from another shift.
What online training changes before the first day
When the invitation is sent before the first day, the activation link leads first to the training, and the password is set only after it. If mandatory training is waiting, the person completes it on their own device, at a convenient time, and the system records the result. On the start day the room is no longer needed for the general part.
The training can be run as a sequence of materials (video and PDF) with one final test, or as a scenario of steps with randomised questions and a required number of correct answers. In a scenario a failed step repeats a fragment of the material, and the final result is recorded only after all steps are passed. The instructor therefore does not have to sit through repeats.
What online training does not replace
Online induction training does not replace on-site job instruction at the hall, which by nature takes place on location, nor the requirements on the form and place of training that the plant's occupational safety service verifies. The calculation below concerns only the general part, which can be moved before arrival. The system provides a record of the result as evidence for audit, and the decision on which elements to move rests with the plant.
Network condition
The induction training player uses external video services in the browser. For training at home this makes no difference, but when a person takes the training on a tablet at the plant, behind the firewall an endless loading wheel may appear. It is worth checking this before changing the model.
Hours per month: classroom versus online training (sample calculation)
- Classroom
- Online before the first day
Sample calculation: 24 people per month
Assumptions: the plant takes on 24 new people per month. In the classroom the training lasts 3 hours, the group has 8 people, so 3 sessions are needed in the month. Online, a person spends 1 hour on the general part before the first day, and the instructor spends 2 hours a month on maintaining the materials and reviewing the results. The labour cost rate is 60 PLN per hour (illustrative assumption).
Classroom: instructor 3 sessions of 3 hours is 9 hours; participants 24 people at 3 hours is 72 hours; total 81 hours. Online: instructor 2 hours; participants 24 people at 1 hour is 24 hours; total 26 hours. The difference is 55 hours per month, that is about 3,300 PLN at 60 PLN per hour.
The result depends on the assumptions. If home training is not counted as working time, the cost for the plant falls further, but this then requires separate agreement with the HR department. If classroom groups are larger, the online advantage shrinks on the instructor side, but still grows on the first-day side.
How to calculate your own variant
To replace the assumptions with your own data, four figures from the last quarter are enough: the number of new people, the number of training sessions, the average session time and the average group size. To this is added the labour cost rate from the finance department.
It is worth adding an item that is harder to capture: the delay in starting at the workstation. If on average a new person waits an hour for a signature and a full set, that time is a cost which training before the first day removes. The record of the result in the system then helps HR close formalities on Friday, not on Monday morning.
- Collect the number of new people and the number of sessions from the last quarter.
- Establish which elements of the training can be moved before arrival, together with the occupational safety service.
- Measure the time people actually spend on the general part online.
- Compare classroom hours with online hours, including maintenance of the materials.
Hours per month with 24 new people
| Parameter | Value |
|---|---|
| New people per month | 24 people |
| Session time in the classroom | 3 h |
| Group size in the classroom | 8 people |
| General part online | 1 h per person |
| Maintenance of online materials | 2 instructor h per month |
| Labour cost rate | 60 PLN/h |
Result: Classroom 81 hours, online 26 hours; difference 55 hours, about 3,300 PLN per month.
Note: Sample calculation on illustrative assumptions, without on-site job instruction; individual quotation.
Video
Frequently asked questions
Does online training replace instruction in the hall?
No. The general part moves before the first day, and job instruction stays on location. The scope is set by the plant's occupational safety service.
How does the result get into the system?
In a training scenario the final result is recorded only after all steps are passed, so the system shows only completed trainings.
Can the result of the calculation be transferred to our plant?
Only after substituting your own figures: the number of new people, session time, group size and rate. The figures in the calculation are sample assumptions.
Let's calculate induction training on your figures
Give us the number of new people and the current session time, and we will show which part of the general training can move before the first day and how to record the result.
Let's talk