Symptom: endless loading, no message
A new person opens the link from the invitation, the system directs them to the induction training, and the video does not start. The screen shows only a loading wheel that never goes away. There is no error message and no suggestion of what to do, so the person refreshes the page, switches browser and finally reports to their supervisor that the system does not work.
The problem shows up most often on a training tablet or a computer on the plant network, because that is where traffic filtering applies. The same person on their own phone, on a mobile network, sees the video without any difficulty, which adds to the confusion and suggests a device fault rather than a network issue.
Cause: external video services
The induction training player uses external video services in the browser. If the plant firewall blocks them, the browser does not receive the material and waits indefinitely. The induction training page itself loads correctly from the InnerWeb system, so the traffic statistics look fine and only the video is missing.
This is a classic case of a dependency that cannot be seen in the application: the system works, but the client's network holds back one of its elements. That is why the diagnosis has to be carried out on the network side, not in the application.
Diagnostic steps for a blocked video
What to check with the IT department, step by step
The first step is a test on a device inside the plant network and on a device outside it. If the video works outside the plant but not inside, the cause lies with the firewall or a proxy server. The second step is the browser console: blocked requests show the names of the domains that need to be unblocked.
The third step is to agree with the IT department the list of domains to allow. When reporting the issue, it helps to give the exact address of the training and the list of blocked domains from the console, which keeps the discussion to one message. The fourth step is a repeat test on the training tablet after the rule changes.
- test the video inside and outside the plant network
- read the blocked requests in the browser console
- list of video domains to allow in the firewall
- repeat the test on the training tablet after the rule change
How to prepare before the training starts
The cheapest practice is to test the player on the training tablet and on the network that new employees will use, before the first Monday. It is enough to open the training from a test account and watch a few seconds of the video. The test takes a few minutes and saves participants from unnecessary waiting on the first day.
The second practice is to notify the IT department that the induction training requires access to external video services, together with the date of the first wave. Firewall rule changes often need to be requested in advance and cannot be made on the day the training starts.
Contingency plan for the first day
If the rule change cannot be made before the start, a contingency plan is needed. The simplest variant is training from a device on another network, for example a separate segment set aside for training, or mobile devices with their own connection. The condition is that the result is recorded on the person's account in the same way as in standard training.
When choosing a contingency plan, remember the order from the invitation: if a mandatory training is waiting, the password is set only after it. A person who does not complete the training will not set a password, so a blocked video holds up the whole process, not just the training.
Video
Frequently asked questions
Why does the video not load while the training page works?
The player uses external video services in the browser. The plant firewall may block them, while the training page from the system loads correctly.
Will the system show an error message?
No. The symptom is endless loading instead of a message, so reports from participants are often imprecise.
How quickly can I check whether it is the network?
Open the same training on a device outside the plant network. If the video works, the cause is traffic filtering in the plant.
Does a blocked video affect the password?
Yes. When a mandatory training is waiting, the password is set only after it, so a person who cannot complete the training cannot set a password.
Prepare the plant network for online training
We will help you prepare a list of network requirements for the induction training for the IT department, and a test on the tablet before the first wave.
Let's talk