Two rules we start from
Beacon placement is based on two density rules. In a building we assume 1 beacon per 100 to 200 m2. On a plant road the beacons are placed roughly every 100 m. Both rules are used to determine the number of devices before the detailed plan.
A worker's position is built from the signals of many beacons, averaged on the map, and works without GPS. That is why the number of beacons translates into the quality of localisation, not only into range coverage.
Step 1: calculate the hall
Divide the floor area of the hall by 200 m2 to get the lower bound, and by 100 m2 to get the upper bound. For a 5,000 m2 hall this gives 5,000 / 200 = 25 beacons and 5,000 / 100 = 50 beacons.
The choice of a point within this range depends on the environment. An open hall with few obstacles can be served at a density close to 1 per 200 m2. A hall with dense machinery, high-bay shelving and metal partitions should be closer to 1 per 100 m2, because the obstacles attenuate the signal.
Zones where the position has to be especially reliable, for example around hazardous areas or emergency exits, are planned at the upper density limit, even when the rest of the hall has the lower density.
Example: number of beacons for a 5,000 m2 hall and 1.5 km of roads
Step 2: calculate the plant roads
On a road, beacons are placed roughly every 100 m. One kilometre therefore corresponds to 10 intervals, and with a beacon at each end about 11 beacons. In practice the project manager assumes about 10 beacons per kilometre of road and adds them to the number from the halls.
Calculation example for a plant with one 5,000 m2 hall and 1.5 km of roads: 15 intervals of 100 m give about 15 to 16 beacons on the roads. Together with the hall this gives from 40 to 66 beacons, depending on the density inside the hall and the number of beacons at the ends of the sections.
Because a road is sometimes routed along building walls, some road beacons may serve the hall at the same time. Do not assume this in advance, however: verify on the plan whether the signal from the road reaches the inside.
Step 3: check the requirement of 5 signals
A 3D position requires readings from at least 5 beacons. The number of beacons in the hall alone is not enough: what counts is how many of them the device receives at a given point at the same time.
A practical test on the plan: at several representative points of the hall, near machines, in the corners and at the exits, count how many beacons are in range without obstacles. If there are fewer than five at some point, the system uses the simpler mode there, which indicates the nearest location from the signal.
The signal strength is averaged over up to the last 4 readings, so a single blocking of a beacon does not spoil the result, but a permanent blocking by a wall or shelving does.
Step 4: transfer the number to the order and the schedule
From the calculated number make the order with a reserve for replacement after calibration. Coverage calibration is set up at the start, before the alarms go live, because the accuracy of localisation depends on coverage, so a few beacons usually have to be moved after the first measurements.
For scale: in the internal estimate for the first version of the offer covering 120 beacons, installation, calibration and training come to about 2 working days across 2 visits. A plant with the 40 to 66 beacons from the example fits into a smaller amount of work, but calibration remains mandatory.
Installation takes place on poles and structures with cable ties or adhesive, without cables and mains power, so the layout plan does not have to take electrical connections into account.
Video
Frequently asked questions
How many beacons for a 5,000 m2 hall?
At a density of 1 beacon per 100 to 200 m2, from 25 to 50. The lower bound fits an open hall, the upper bound a hall with dense machinery.
What about the roads between halls?
A plant road requires beacons roughly every 100 m, so a kilometre needs about 10 beacons.
How do I check whether the plan is enough for a 3D position?
At representative points, count the beacons in range without obstacles. A 3D position requires readings from at least 5 beacons; where there are fewer, the simpler nearest-location mode works.
Can the number of beacons change after installation?
Yes. Coverage calibration is done before the alarms go live, and on its basis some beacons are moved or added.