BLE beacon placement in an industrial plant: 8 guidelines

The placement of BLE beacons decides whether worker location is genuinely useful or merely impressive on a map. Two numbers are the starting point: about 100 m spacing on plant roads and 1 transmitter per 100–200 m2 inside buildings. Below are eight guidelines for safety managers and maintenance teams, based on InnerWeb deployments and proposals.

120
beacons for 9 buildings in the example proposal
ok. 100 m
spacing on plant roads

Who these guidelines are for

We address these guidelines to people responsible for the safety of workers on site: OHS managers, security services, process safety and maintenance departments. They apply both to large installations covering hundreds of hectares and to closed facilities with a few buildings. The common denominator is one: a worker's position must be known also where there is no GPS.

The numbers in this text come from two sources. The first is a location concept for a petrochemical installation: about 100 m spacing on roads and 1 transmitter per 100–200 m2 in buildings. The second is a prepared proposal for a closed facility, where 120 beacons were planned for 9 multi-storey buildings.

1. Roads and yards: spacing of about 100 m

Along plant roads, transmitters are placed about every 100 m. This value is chosen for vehicle and pedestrian traffic in open space, where an accuracy of a dozen or so metres is enough to indicate a section of the route. Spacing wider than 100 m lowers cost but increases the deviation and the number of position jumps.

Mounting on existing poles, fences and load-bearing structures is faster than putting up new masts. The transmitters run on batteries, so they need no cables or mains power.

Number of transmitters for a 4 000 m2 hall at different densities

Number of transmitters for a 4 000 m2 hall at different densitiesChart: a 4 000 m2 hall needs 40 transmitters at a density of 1 per 100 m2 and 20 at 1 per 200 m2.010203040pcs1 per 100 m21 per 100 m2: 40 pcs401 per 200 m21 per 200 m2: 20 pcs20
Source: Example calculation: 4 000 m2 / 100 m2 = 40, 4 000 m2 / 200 m2 = 20 (density from)

2. Inside buildings: 1 transmitter per 100–200 m2

Inside buildings, the assumed density is 1 transmitter per 100–200 m2. At the lower limit of 100 m2 you get better room discrimination; at the upper limit of 200 m2, a lower cost. The choice depends on whether the plant needs to know which building a person is in or which room.

Area is counted for each floor separately. A hall of 4 000 m2 therefore needs between 20 and 40 transmitters, not a number derived from the total of the entire facility.

3. Every floor has its own set

Ceilings and walls attenuate the signal, so the floor is determined by a transmitter mounted on that floor. Do not assume that ground-floor transmitters will cover the first floor. The online map has an indoor mode with floor selection, so the dispatcher sees the floor where a worker is located, but only provided that transmitters have been mounted and labelled on every floor.

4. Corners, entrances and stairwells

Places where a worker changes floor or enters a building need a locally denser grid. A stairwell and a lift form a vertical communication node: a transmitter on every landing makes it possible to tell which floor a person is on during an evacuation. Building entrances are best marked with a separate transmitter, because they set the boundary between the position outside and inside.

Room corners and corridor ends prevent the effect in which the position drifts towards the middle of the area. The edge of an area without a transmitter is usually where the largest deviation occurs.

5. A plan instead of intuition: map and audit first

Placement is planned on a plant map with buildings and floors, drawn in the map editor. The map is built for each facility, so do not assume a ready-made plan without implementation work. A site audit precedes the design: wall materials, metal structures, mounting points and the range of lone-working places are checked.

6. Explosive atmosphere zones: ATEX version

In zones 2 and 22, beacons in the ATEX version are used. For zones 1 and 21, certification is commissioned for the needs of the client's installation, with no promise of a date. If the plan assumes transmitters in a higher-risk zone, this must be built into the schedule at the planning stage, not only at installation.

7. Example scale: 120 beacons for 9 buildings

In a proposal for a closed facility with 9 multi-storey buildings and a courtyard, 120 beacons were planned. This gives about 13 transmitters per building on average. Mounting a single beacon is estimated at 5–8 minutes, and the on-site work at about 2 working days in 2 visits. This is an internal estimate, verified by calibration after the first visit.

8. Calibration, deviation tests and a service reserve

After mounting, a control route is walked with a device and the position is compared with the map. Places with a large deviation are corrected with an additional transmitter or a different mounting spot. In a simulation for an installation with 100 m spacing, the mean deviation was 15 m and the maximum 39 m, so the acceptance thresholds are worth agreeing with the client in writing before handover.

It is also worth planning a small reserve of beacons for range corrections and replacement of damaged units. Batteries last several years in the range from -40 to 60 °C, but a service plan, with battery status read from the platform, should exist from day one.

Video

Frequently asked questions

How many transmitters does a hall need?

At a density of 1 per 100–200 m2, a hall of 4 000 m2 needs 20–40 transmitters (example calculation). The final number is set by the audit.

Do the transmitters need cables?

No. They are fixed with cable ties or adhesive and run on industrial batteries for several years.

Can two floors be served by one set?

We do not recommend it. Ceilings attenuate the signal, so each floor needs its own transmitters.

Sources

Let's talk about location in your plant

We will show a concept on the outline of your site and buildings: transmitter spacing, number of units and scope of work. Book a conversation with the InnerWeb team.