Cost of installing 120 beacons in two visits: an estimate for procurement

In the internal estimate for the first version of the offer (120 beacons), installation, calibration and training come to about 2 working days across 2 visits, and later updates are remote. Below is the cost structure that the procurement department can transfer to its own spreadsheet, together with a sample calculation that states its assumptions openly, to be replaced with your own rates.

approx. 2 days
installation, calibration and training for 120 beacons
Source: card
5,600 PLN
sample calculation for installation and calibration
Source: sample calculation

What the installation cost is made of

A beacon network is inexpensive to install compared with cabled infrastructure, because the beacons are mounted on poles and structures with cable ties or adhesive, without cables and without mains power. There is therefore no drilling, no cable entries and no electrician's work at each point.

The on-site cost has four items: the labour of the installation crew, travel and logistics, small fixing materials, and the time of people on the plant side who accompany the crew and take part in the training. The price of the beacons themselves is a separate item and is not part of this estimate.

For procurement it matters that later software updates are remote, so they do not require further visits. The cost of field service appears only when batteries are replaced, which is described in a separate analysis.

Why two visits

About 2 working days for 120 beacons is split into 2 visits for a specific reason: the coverage calibration of the beacons is set up at the start, before the alarms go live, because the accuracy of localisation depends on coverage. After the first installation, measurements have to be collected, places with weak coverage detected, and only then is the configuration closed.

The estimate assumes that the first visit covers the installation of beacons according to the layout plan, and the second visit covers the coverage calibration and user training. The gap between the visits lets the plant report places where a beacon had to be moved because of the structure or machine movement.

For the client, splitting the work into two visits reduces risk: an error in the layout plan comes to light before the alarms go live, not after the first false report.

Cost structure of installing 120 beacons

Cost structure of installing 120 beaconsHorizontal bar chart: labour 3,840 PLN, materials 960 PLN, travel and logistics 800 PLN.01000200030004000PLNLabourLabour: 3840 PLN3840Fixing materialsFixing materials: 960 PLN960Travel and logisticsTravel and logistics: 800 PLN800
Source: Sample calculation based on the assumptions in the section Assumptions of the sample calculation

Assumptions of the sample calculation

The assumptions below are examples and serve as a template. Procurement should insert its own crew rates and logistics costs. Only the number 120 beacons, 2 working days and 2 visits come from the card; the rates, crew size and material costs are estimating assumptions.

  • Crew: 2 people, 2 working days of 8 hours each, i.e. 32 person-hours.
  • Labour rate: 120 PLN per person-hour (assumption).
  • Travel and logistics: 400 PLN per visit, 2 visits (assumption).
  • Fixing materials (cable ties, adhesive): 8 PLN per beacon (assumption).

Result: what it costs

Labour: 32 person-hours times 120 PLN gives 3,840 PLN. Travel and logistics: 2 visits times 400 PLN gives 800 PLN. Fixing materials: 120 pieces times 8 PLN gives 960 PLN. Total 5,600 PLN, or about 47 PLN per beacon.

This is the amount for installation and calibration alone under these assumptions. The total project cost also includes the price of the beacons, the software licence and the time on the plant side. The individual InnerWeb quotation covers these separately.

When the assumptions change, the calculation scales simply: one extra day of a two-person crew costs 1,920 PLN at a rate of 120 PLN. For a plant with a large site, travel between buildings lengthens the work, so the 2 days should be treated as a reference point for 120 units, not as a guarantee.

What to check before approving the budget

The largest variable is access to the installation points. Poles and structures at height may require a lift or work-at-height authorisations, which changes the hourly cost of the crew. Agree this with the head of maintenance before the visit.

The second variable is explosion-hazard zones. The InnerWeb beacon has a CE declaration and ATEX certification for zones 2 and 22; certification for zones 1 and 21 is commissioned for the client's installation, which lengthens the schedule and adds a cost that is not in this estimate.

The third issue is the crew's site pass and the plant's working hours. If installation is possible only outside the production shift, the number of days may change.

Example calculation

Installation and calibration of 120 beacons in 2 visits

Assumptions
ParameterValue
Number of beacons120 pcs
Crew working time2 working days
People in the crew2 people
Labour rate120 PLN per person-hour
Travel and logistics400 PLN per visit
Fixing materials8 PLN per beacon

Result: 5,600 PLN in total (labour 3,840 PLN, travel 800 PLN, materials 960 PLN), about 47 PLN per beacon, excluding the device price and licence.

Note: Sample calculation based on the assumptions given above. Only the number of 120 pieces, 2 working days and 2 visits come from the card; the rates and costs are assumptions to be replaced with your own. Indicative ranges from 2025 to 2026 deployments; individual quotation.

Video

Frequently asked questions

Does installing beacons require running cables?

No. Beacons are mounted on poles and structures with cable ties or adhesive, without cables and without mains power.

Why is the installation done in two visits?

Coverage calibration is set up at the start, before the alarms go live, because the accuracy of localisation depends on coverage. The second visit allows the layout to be corrected after the first measurements.

Do software updates require further visits?

No. Later updates are remote, so after the rollout is complete, field visits mainly concern device service.

Are 2 working days a guarantee for every plant?

No. It is an estimate for 120 beacons in the first version of the offer. Access to places at height, Ex zones and the plant's working hours may lengthen the schedule.

Calculate the installation for your plant

Book a conversation: from the plant layout we will count the number of beacons and the scope of the two visits, and you insert your own rates.

Let's talk