InnerWeb
Skip to main content

Guest invitation system: a step-by-step guide

The guest invitation system leads from sending one email to entry to the plant, without manual steps on the part of security. The guide is for the administrator who launches the pilot: it shows the order of configuration, the parameters of the link and the places where an invitation most often stops.

7 days
validity of the activation link
Source: system feature
2 s
roughly per account in a mass invitation
Source: system feature

Step 1: prepare the account and the delivery channel

An invitation starts with an account created by a person with authority. Before you send the first invitation, decide which channel will reach the guest: email comes first, an SMS with a short link is the backup, and without either of them the operator receives the link to pass on in person.

The system distinguishes creating the account from delivering the message. The account exists even when the email was not delivered, and the operator can see that the delivery channel is none. It is worth checking this right after sending the first test message, before you invite a group.

Step 2: check the training in the guests' languages

The content of the email depends on the type of company. An internal employee gets a short welcome with an activation button, while a person from an external company also gets the plant address, a map with directions and an optional training section. If there is no active introductory training in the language of the account, the person goes straight to setting a password, skipping the training that the plant expects.

That is why, before inviting a group, check the set of training materials in every language of the accounts. The training on the kiosk supports Polish, English, Ukrainian and Russian. Remember also that material loaded from an external video service may hang behind the plant firewall without any message, so the invitation should not depend on a third-party host.

System working time for mass invitations (approximate)

System working time for mass invitations (approximate)Bar chart: 100 seconds for 50 accounts, 200 for 100 accounts, 400 for 200 accounts.0100200300400seconds50 accounts: 100 seconds10050 accounts100 accounts: 200 seconds200100 accounts200 accounts: 400 seconds400200 accounts
Source: Sample calculation: roughly 2 seconds per account, no bulk import

Step 3: send the invitation and watch the guest's path

The invitation carries one activation link valid for 7 days; simply opening it does not use it up. After the click the system checks the state of the account and guides the guest in a fixed order: outstanding training, possible joining the work, setting a password. The invited person needs exactly one email.

After the password is set the person is logged in automatically, without typing the address and password again. With 2FA enabled they return to the login form, which is intended behaviour. An account created from an invitation activates by itself once the password is set, while an account created by self-registration waits for approval from a person with authority.

Entry without a password

A guest who has completed the training but has not set a password is admitted through the gate like an active account, and on the lists has the status No password. The password is needed only to log in to the system.

Step 4: prepare for expired links and groups

An expired or used link does not end with a 404 error. The system redirects to login with a message, and the invited person can request a new password link. Help desk usually does not need to intervene, but it should know this path.

For group invitations remember that there is no bulk import. Onboarding is a loop of creating an account and sending an invitation, roughly 2 seconds per account. For the pilot this is a sufficient pace, but the list of accounts has to be prepared in advance and split into batches, so that errors are easier to catch.

  • Send a test message to your own address first.
  • Invite a pilot group, not the whole company.
  • Check the list of accounts after 24 hours and assess the statuses.
  • For accounts that have not activated, send a new link before the 7 days expire.

Evidence for an audit and pilot measures

At the end of the pilot measure three things: how many invitations were sent, how many accounts were activated within 7 days and how many help desk tickets the path generated. These data provide evidence for an audit and help decide whether to extend the scope to further groups of guests.

The rollout pattern from a corrugated packaging manufacturer covers guest registration by phone, naming a host, a health declaration and a health and safety briefing in language versions. In it the invitation is one of several entry channels, alongside the QR poster and reception.

Checklist

Video

Frequently asked questions

How many emails does an invited guest need?

One. After the click the system leads them through the training, possible joining the work and setting a password.

What if a guest opens the link after 8 days?

They are redirected to login with a message and can request a new password link.

Can I invite hundreds of people with one file?

There is no bulk import. Invitations are sent in a loop over the accounts, roughly 2 seconds per account.

Launch the invitation pilot

We will go through the configuration of the channel, the training and the pilot group together. Book a conversation with the InnerWeb team.

Let's talk