InnerWeb
Skip to main content

Guest account activation: the most common questions after receiving an invitation

Guest account activation starts with one email containing a link valid for 7 days. Below are the questions guests and external companies ask at their first login, with answers for the site help desk: what the invited person sees, when the account becomes active and what to do when the link stops working.

7 days
validity of the activation link
Source: system feature
1 email
needed for the invited person to go through the whole path
Source: system feature

The link in the email: validity and repeated opening

The invitation contains one activation link, valid for 7 days. For the help desk this is the most important number, because most reports that the link does not work come after this period has passed, or when the email landed in the spam folder and was opened late.

Simply opening the link does not use it up. A guest can open the message on a phone on the way and come back to it later on a computer in the office, and it will still lead to the same screen. The link stops working only after it expires or after it has been used to set a password.

Do I have to create the account myself?

No. The account is created by the person who sends the invitation, and the guest receives one email. There is no app to download and no numbers to copy from a card: every next step is handled by the browser after clicking the button in the message.

Can I click the link a second time?

Yes, until the term expires. The system checks the current state of the account each time, so after an interrupted activation the guest returns exactly to the step where they stopped.

What the guest sees after clicking: the order of screens

After the click the system checks the state of the account and guides the guest through three possible steps in a fixed order: first any outstanding training, then joining the work if applicable, and finally setting a password. The invited person needs exactly one email, not separate messages for each stage.

If there is no active introductory training in the language of the account, the person goes straight to setting a password. That is why, before inviting a group, it is worth checking that an active set of training materials exists in every language in which accounts will be created. Training material for guests is available in language versions, and the kiosk at the gate supports Polish, English, Ukrainian and Russian.

Why did one guest see a video while a colleague from another company went straight to the password?

Because the screen depends on the state of the account and on the language. A person who has not completed the introductory training watches it first. A person for whom there is no active training in their language goes straight to the password, so the difference results from how the training set is configured, not from an error.

What does the email for an external company contain?

The content depends on the type of company. An internal employee gets a short welcome with an activation button. A person from an external company additionally sees the plant address, a map with directions and an optional training section.

Invitation and activation parameters

Invitation and activation parametersHorizontal bar chart: the link is valid for 7 days, one email, three activation steps, four training languages at the kiosk.02468countDays the link is validDays the link is valid: 7 count7Emails requiredEmails required: 1 count1Activation stepsActivation steps: 3 count3Training languages at thekioskTraining languages at the kiosk: 4 count4
Source: Documentation of the invitation feature and introductory training

Password, automatic login and the second factor

After setting a password from the invitation, the person is logged in automatically, without typing the address and password again. This shortens the first login to a single click after the password is set, and it reduces reports of the type I set the password and the system still asks for my details.

The exception concerns accounts with two-factor authentication enabled: after setting the password, the user returns to the regular login form and goes through the full path with the second factor. The help desk should know this exception, because it looks like a return to the start, while it is intended behaviour.

  • The password is needed to log in to the system, not to enter the plant itself, if the training has been completed (details in the section on accounts without a password).
  • An account created from an invitation activates automatically once the password is set.
  • An account created by self-registration requires approval from a person with authority: security, administrator, manager or health and safety.

The link has expired or was already used

An expired or used link does not end with a 404 error. The system redirects to the login screen with a message, and the invited person can request a new password link. This way the guest is not left on an empty page and does not have to call the help desk just to ask what happened.

If the email did not arrive, check the delivery channel. Email comes first, an SMS with a short link is the backup, and without either of them the operator receives the link to pass on in person. The system distinguishes creating the account from delivering the message: the account exists even if the message was not delivered, and the operator can see that the delivery channel is none.

The invited person says they did not get the email. What should I check first?

First the state of the account and the delivery channel visible to the operator, then the spam folder of the guest. When the channel is none, the link is passed on in person or a new password link is requested.

Instructions for IT support: five diagnostic questions

The first line of support resolves most reports if it asks questions in a fixed order. The list below shortens the call, because it narrows down the causes from the most common to the rarest and does not require access to the guest account.

  • When was the invitation sent: have 7 days passed since it was sent.
  • Which channel was used for the invitation: email, SMS or a link passed on in person.
  • Does the account come from an invitation or from self-registration, and is it waiting for approval.
  • Has the guest completed the introductory training in their language.
  • Does the account have two-factor authentication enabled, which explains the return to the login form.

Video

Frequently asked questions

How long does the activation link work?

The link is valid for 7 days from sending the invitation. Simply opening it does not use it up, so it can be opened repeatedly until it expires or a password is set.

What should I do when a guest has set a password but still sees the login screen?

If the account has two-factor authentication enabled, after setting the password the user returns to the login form. This is intended behaviour, not an activation error.

Does an account created by self-registration activate by itself?

No. Such an account requires approval from a person with authority: security, administrator, manager or health and safety. An account created from an invitation activates by itself once the password is set.

What happens after clicking an expired link?

The system redirects to the login screen with a message. The invited person can request a new password link, so they do not land on an empty error page.

See the invitation path in a live demo

We will show during a demo how an invitation, activation and a guest's first login look at your plant. Book a conversation with the InnerWeb team.

Let's talk