Symptom: endless loading without an error
Training material fetched from an external video service can hang behind the plant firewall. The guest sees a loading spinner that never goes away, and the report to the guard says: it does not work. The lack of an error message is typical: the firewall often does not reject the connection, but holds it.
The problem mainly affects people using the plant network, for example a tablet at reception or a phone connected to the guest network. From a mobile network the same video often works without any issue, which makes diagnosis harder, because a person from outside says that everything is fine on their side.
Why the invitation should not depend on a third-party host
An invitation carries a single activation link valid for 7 days. If the key step, that is the introductory training, depends on a server that the plant does not control, every change in the firewall policy can stop the whole path. The IT/OT department is not always informed which domains the guests need, so the blockage appears quietly.
After the link is clicked, the system checks the state of the account: an outstanding training, then any joining of work, and finally setting the password. The training comes first, so a hung video blocks everything that follows it.
Testing the training link at four network points
How to check before rollout
The test is simple and takes about fifteen minutes. The IT/OT department carries it out together with the system administrator.
- Open the training link from the tablet at reception, from a computer on the plant network and from a phone on the guest network.
- Compare the result with the mobile network outside the plant.
- Check which video and preview domains are needed, and record them in the request to the firewall team.
- Repeat the test after every change to firewall rules or to the guest network.
What to do when the video is blocked
There are two routes. The first is unblocking the indicated domains on the firewall for the network used by guests and kiosks. This is quick, but depends on the plant's security policy, and in production plants the OT network policy can be strict and may not allow changes for guest traffic.
The second route is delivering the training material from the plant's own infrastructure or from our domain, so that the guest does not connect to a third-party host. In projects where reliability matters to us, we recommend this second option: fewer exceptions on the firewall, fewer points of failure.
Training at the kiosk and on the tablet
A supplier, a courier or a guest can complete the introductory training on a tablet by themselves. The kiosk recognises a trained person and welcomes them, while an untrained person is shown the training. If the tablet stands on the plant network, the same firewall applies to it. The tablet at reception is therefore the first place to test.
Once a guest has completed the training but has not set a password, the system lets them through the gate like an active account, and on the lists they have the status No password. This means everything depends on whether the training was actually played to the end. A hung video means no training, not a passed one.
Order of actions for the IT/OT department
First a test from several points on the network, then deciding which domains are needed, then the decision: unblocking or an own source of material, and finally a repeated test after the change and recording of the result in the implementation documentation. The whole cycle can be closed in one working day, provided the firewall request is well described.
Checklist
Video
Frequently asked questions
Why does the video load endlessly instead of showing an error?
The firewall often holds the connection to an external host instead of rejecting it, so the browser keeps waiting and reports no error.
Does a guest with a hung video pass the training?
No. A hung video means the training was not played. The guest should not be treated as trained.
Who should run the test?
The IT/OT department together with the system administrator, before the first wave of invitations and after every change to firewall rules.
Let's test the training on your network
Together with your IT/OT department we will check whether the introductory training loads on the plant network before you send the first invitations.
Let's talk