What the printout is for
The printout of the evacuation list is one page per group, so that the commander can hand out sheets to the marshals at the assembly point. This layout is deliberate: the marshal does not review the whole plant, only their group, and the commander sees which sheets came back with people ticked off.
The printout does not replace the plant evacuation procedure. The procedure defines the responsible persons, signals, routes and assembly points. The printout provides a reliable and current attendance document for that procedure.
Step 1: open the list and check how fresh it is
The evacuation list answers one question: who is physically on the plant premises now, and where to look for them; it is built from QR scans at the gate. On the screen it refreshes itself every 13 seconds, so before printing it is enough to wait for the next refresh and make sure the time of the state matches the state you want to print.
Sheets for the drill: working set and spare set
Step 2: check the six groups in their fixed order
The list divides people into six groups in a fixed order: visitors, couriers, suppliers, plant employees, external companies and the Uncertain tab. In an office building the two largest groups are usually plant employees and visitors. The floor marshal should know which group their sheet covers and check this before entering the building on the drill day.
Why one page per group
A sheet per group shortens the handout: the commander does not split the list by hand, and the marshal does not have to look for their people among hundreds of names. At the same time the list does not hide groups with fewer people, because even one person in the couriers group needs to be checked.
Step 3: read the Uncertain tab
The evacuation list is designed to show more people rather than fewer: a person on the list who has already left costs a wasted search, while a person missing from the list is not searched for by anyone. That is why a person whom the gate register still considers present, but whose status is doubtful, does not disappear and goes to the Uncertain tab with a reason.
Example reasons are a last entry older than 12 hours, or an exit scan that was refused. Before printing, the marshal should read the reason next to each person, because it determines how the person is checked.
What to do with a person whose reason is 'last entry older than 12 hours'
Call the person or their supervisor, and during a night shift check the rota. If the person did leave without a scan, the entry will be closed according to the system settings.
What to do with a person after a refused exit scan
A refused exit scan leaves the person in the register as present, even though they may already be outside the plant. The marshal checks them separately at the assembly point, and if in doubt reports to security. After the drill it is worth establishing the cause of the refusal, so that it does not recur in a real alarm.
Step 4: print and hand out
The printout is made in the same window in which the list is viewed, directly before the handout. The evacuation commander hands the sheets to the marshals at the assembly point. For the drill, assume the sheets are printed just before the alarm and that a spare set is available.
Illustrative calculation: 6 groups mean 6 sheets, plus a spare set makes 12 sheets. In a drill with 4 marshals, each one receives the sheets for their group, and the commander keeps a control set. This is an organisational example, not a standard.
Step 5: record the evidence from the drill
After the drill collect the sheets with the people ticked off and record: how many people were on the list, how many were checked, how many were in the Uncertain tab, and the time from the alarm to closing the list. A good drill does not end with the statement that everyone got out, but with a list of discrepancies and corrective actions.
Checklist
Video
Frequently asked questions
Does the printout replace the evacuation procedure?
No. The printout provides an attendance document, and the plant procedure still defines the persons, signals and routes.
Why is a person who has left on the list?
The list prefers to show too many people rather than too few, because a person missing from the list is not searched for by anyone.
How often does the list refresh?
The evacuation list refreshes itself every 13 seconds.
Test the list printout before the drill
We will show the list, the six groups and the printout on a plant office building scenario. Book a conversation with OHS and security.
Let's talk