Evacuation of an office block beside the production hall: a scenario for the safety manager

At a plant where the office block stands right next to the hall, administration staff often use their own entrance and never scan the QR code at the gate. Below is a scenario in which the safety manager works step by step to establish which office staff end up on the evacuation list and which must be added by organisational means.

13 s
how often the evacuation list refreshes
Source: feature card: evacuation list
6
groups of people on the list in a fixed order
Source: feature card: evacuation list
12 h
default maximum stay without an exit scan
Source: feature card: evacuation list

Starting point: a plant concept with an office block beside the hall

This text describes an implementation scenario for a plant of the following type: a production hall with an office block next to it, housing purchasing, accounting, planning and customer service. It is not a description of a completed implementation but a concept based on the functions of the evacuation list, which a safety manager can adapt to local conditions.

For the purpose of the example we assume three things. The plant has a gate with entry control, where QR codes are scanned. The office block has its own door from the car park, so part of the administration enters without passing the gate. About 120 people work in the office block, and at the same time dozens of guests and external contractors are on site. These numbers are an illustrative assumption and do not come from any specific plant.

The problem: the list only sees those who scanned in

The evacuation list answers one question: who is physically on the plant site now and where to look for them. It is built from QR scans at the gate. The consequence for the office is clear: a person who never scanned the code at the entrance has nothing on the basis of which they could appear on the list.

For the safety manager this is a warning sign even before any evacuation. If 120 administration staff do not scan the code, the list will show only part of the workforce in the plant employees tab, and the assembly point will be accounted for on incomplete data. This matters, because a person missing from the list is not searched for by anyone.

Why the office falls out of the records so easily

An administration employee usually has a building access card and does not treat the plant gate as a registration point. From their point of view, entering the office block is entering work, and the QR scan is a duty of the hall. The lack of a scan is not bad will; it results from the fact that nobody told the office why the scan exists.

Evacuation list coverage in the office block: example calculation

Evacuation list coverage in the office block: example calculationBefore and after chart: before agreeing the scan 30 people on the list and 90 off it, after agreeing 108 on the list and 12 off it.0255075100125people out of 120Before agreeing the scan (People on the list): 30 people out of 12030After agreeing the scan (People on the list): 108 people out of 120108People on the listBefore agreeing the scan (People off the list): 90 people out of 12090After agreeing the scan (People off the list): 12 people out of 12012People off the list
  • Before agreeing the scan
  • After agreeing the scan
Source: Example calculation: office block of 120 people, assumptions from the Effect section

Step-by-step solution

The scenario assumes that the safety manager does not begin by changing the system but by establishing the actual state. Each of the steps below can be completed within one working week, and their order matters.

  • Step 1: list the entrances to the office block and check which of them bypass the gate with QR scan control.
  • Step 2: check in the plant employees tab how many administration staff have any entry record at all.
  • Step 3: agree with security and IT whether the office scans the QR code at the gate or at its own entrance.
  • Step 4: appoint a floor coordinator in the office block who collects the printout and knows their group of people.
  • Step 5: decide how to treat people who entered and did not scan their exit.

What the safety manager sees on the list

The list divides people into six groups in a fixed order: guests, couriers, suppliers, plant employees, external contractors and the Uncertain tab. Office staff should appear in the plant employees tab. The list refreshes itself every 13 seconds, so the safety manager sees changes without reloading the screen.

A printout of the list is one page per group. The incident commander can therefore hand out sheets to coordinators at the assembly point, and the office block coordinator receives a sheet with the people the system regards as present. The printout does not replace the plant evacuation procedure; it supports it.

Why it is better to have too many than too few

The list is designed to show more people rather than fewer. A person shown on the list who has already left costs an unnecessary search. A person missing from the list is not searched for by anyone. For the office block this means one rule: it is better to complete the scans than to explain gaps.

People whose exit nobody recorded

The second problem of the office block is exits. An administration employee who scanned in in the morning and left in the evening through the gate without a scan still appears as present. The system does not quietly remove such a person from the list: they move to the Uncertain tab with a stated reason, for example when the last entry is older than 12 hours or when the exit scan was refused.

The automatic closing of stays runs every 3 hours, and the default maximum stay without an exit scan is 12 hours. The safety manager should know these values, because during an exercise the question "why is this person still on the list" is most often asked by floor coordinators. The answer is: because not enough time has passed since the last scan for the automat to close the stay.

Effect: an example calculation and conclusions

Assume that before the change 30 of the 120 people in the office block are scanned, and after agreeing a scan at the office block's own entrance 108 of 120 are scanned, that is 90 percent. These values are an input to the calculation, not a measurement. List coverage of the office rises from 25 to 90 percent of the block, and the number of people who must be accounted for only from the floor coordinator's memory falls from 90 to 12.

There are three conclusions for the safety manager. First, the list is only as good as the scanning discipline, so the first task is a habit, not a tool. Second, the Uncertain tab is a daily signal for the office to tidy up exits, not a tool to be used only on exercise day. Third, the printout must be rehearsed with floor coordinators before the first real evacuation, so that nobody at the assembly point searches for their own sheet.

Example calculation

Evacuation list coverage in the office block

Assumptions
ParameterValue
Office block staff120 people
Scanning before the change30 people
Scanning after agreeing the scan at the office block entrance108 people

Result: List coverage rises from 25 to 90 percent of the block; people accounted for only from the floor coordinator's memory fall from 90 to 12.

Note: Example calculation based on the assumptions above; it is not a measurement at any specific plant.

Video

Frequently asked questions

Will the evacuation list detect office staff who do not scan the code by itself?

No. The list is built from QR scans at the gate, so a person without a scan has nothing on which to appear. The safety manager should agree with security and IT where the office scans the code.

What happens to a person who scanned the entry but not the exit?

They do not disappear from the list. They move to the Uncertain tab with a reason, for example when the last entry is older than 12 hours. The automat closing stays runs every 3 hours.

Does the printout replace the evacuation procedure?

No. The printout is one page per group, which the incident commander hands to coordinators at the assembly point. The plant evacuation procedure remains a separate document.