InnerWeb
Skip to main content

Checklist: plant office building evacuation on the day before a drill

An evacuation drill will only show what the list of people present is able to show, so the day before it is worth checking that the list is complete. Below is the coordinator checklist: scans, people in training, people in the Uncertain tab, the 12-hour stay threshold, groups and the printout, with commentary on why each item matters.

13 s
refresh interval of the list
Source: feature card: evacuation list
12 h
default maximum stay without an exit scan
Source: feature card: evacuation list
3 h
cycle of the automatic check-out
Source: feature card: evacuation list

What the drill really tests

An evacuation drill tests two things: whether people know what to do, and whether anyone knows who is in the building. The first part depends on training and signage, the second on the quality of the list of people present. The evacuation list answers one question: who is physically on the plant premises now, and where to look for them; it is built from QR scans at the gate.

If the list is faulty, the drill will reveal it, but it is better to detect it the day before. That is why the checklist concerns mainly the data: the completeness of the scans, the groups and the people the system considers uncertain.

Scans and refresh

The first check concerns currency. The evacuation list refreshes itself every 13 seconds, so the coordinator should open it the day before and see whether the numbers change with traffic at the gate. If the list is frozen, the problem lies with the scans or the connection, not with the drill.

The second check is the gates: whether the scanners work at entry and at exit. An exit scan that is refused leaves the person on the list as present, which overstates the count. This is consistent with the assumption of the list: it prefers to show too many people rather than too few.

Evacuation list parameters

Evacuation list parametersBar chart of parameters: refresh 13 s, cycle 3 h, maximum stay 12 h, 6 groups051015valueRefresh (s): 13 value13 valueRefresh (s)Automat cycle (h): 3 value3 valueAutomat cycle (h)Max stay (h): 12 value12 valueMax stay (h)List groups: 6 value6 valueList groups
Source: Feature card: evacuation list

Groups, training and uncertain entries

The list divides people into six groups in a fixed order: visitors, couriers, suppliers, plant employees, external companies and the Uncertain tab. The coordinator should check that on the drill day there are no visitors without a host and no external companies without an assigned group.

A person who scanned at a training station is on the evacuation list from the moment of the scan as present in training, even though the station does not record entry to the premises. If the drill takes place while training is running in the building, such a person will be included in the count, although they did not pass through the gate.

The Uncertain tab holds people whom the gate register still considers present, but with a reason, for example the last entry being older than 12 hours or a refused exit scan. The day before the drill it is worth reviewing this tab and clarifying as many cases as possible.

Stay threshold and automatic check-out

The automatic closing of stays runs every 3 hours, and the default maximum stay without an exit scan is 12 hours. For an office building with a single shift the threshold usually does not get in the way, but during night or extended work it may close the entry of a person who is still working.

The coordinator should know what threshold is set and whether it applies on the drill day. Changing the settings belongs to the system administrator, not to the coordinator.

Printout and evidence

The printout of the evacuation list is one page per group, so that the commander can hand out sheets to the marshals at the assembly point. The printout does not replace the plant evacuation procedure. The day before the drill it is worth printing a test set to check the legibility and the number of pages.

After the drill record the numbers: people on the list, people checked, people in the Uncertain tab and the time to closing. Such a record is evidence for an audit and the basis for corrections in the next drill.

Checklist

Video

Frequently asked questions

Does the checklist replace the evacuation procedure?

No. It concerns the completeness of the list data, and the plant procedure still defines the persons, signals and routes.

What to do if the list does not refresh?

Check the connection and the scanners at the gate, and if there is no improvement report it to the system administrator before the drill.

Are people in training on the list?

Yes, from the moment of the scan at the training station, as present in training, even if they did not pass through the gate.

Check the list before the drill

We will go through the checklist with you on a plant office building scenario. Book a conversation with OHS and security.

Let's talk