InnerWeb
Skip to main content

Office building evacuation at the plant: who counts people and what the floor marshal holds

After an alarm in the office building of a production plant everyone knows they have to leave, but few people know who checks afterwards that everyone got out. Below are answers to the questions of floor marshals, security and OHS: where the list of people comes from, how often it refreshes, what its groups mean and what the list does not decide.

13 s
refresh interval of the evacuation list
Source: feature card: evacuation list
6
groups on the list in a fixed order
Source: feature card: evacuation list

How the list knows who is in the building

The evacuation list answers one question: who is physically on the plant premises now, and where to look for them. It is built from QR scans at the gate, so it relies on what was actually registered at entry and exit, not on the work schedule or the attendance list from the morning.

For the office building this means one limitation that should be explained clearly to the marshals: the list shows presence on the plant premises, not at a particular desk. Information about where to look for a person comes from additional data, if the plant has implemented it. The floor itself is not always known.

How often does the list refresh?

The evacuation list refreshes itself every 13 seconds. The marshal does not have to reload the page or ask security for a new printout to see who has passed through the gate in the meantime.

Is a person scanned only at a training station also on the list?

Yes. A person who scanned at a training station is on the evacuation list from the moment of the scan, as present in training, even though the station does not record entry to the premises. This matters in an office building, because the training room is often in the same building and participants have not yet passed through the gate in the register sense.

Who counts people after an alarm

In practice three roles count, and each holds something different. The evacuation commander has the full list and decides when the plant is checked. Floor or group marshals receive their sheets from him at the assembly point. Security checks whether anyone was left inside.

The printout of the evacuation list is one page per group, so that the commander can hand out sheets to the marshals at the assembly point. The printout does not replace the plant evacuation procedure: the designated persons, signals and routes still apply.

Which groups are on the list?

The list divides people into six groups in a fixed order: visitors, couriers, suppliers, plant employees, external companies and the Uncertain tab. The fixed order matters under stress: the marshal knows where to look and does not search for a group name that has moved.

Why are visitors at the top?

A visitor does not know the building, the route or the assembly point, so the risk that they stay on a floor or get lost on the way is highest. Their host from the plant should be named at the moment of the invitation.

People checked per marshal (example)

People checked per marshal (example)Bar chart: four marshals with 30 people each in the example0102030peopleMarshal 1: 30 people30 peopleMarshal 1Marshal 2: 30 people30 peopleMarshal 2Marshal 3: 30 people30 peopleMarshal 3Marshal 4: 30 people30 peopleMarshal 4
Source: Illustrative calculation: 4 marshals with 30 people each

A list that prefers to show too much

The evacuation list is designed to show more people rather than fewer. The reason is simple: a person on the list who has already left costs a wasted search, while a person missing from the list is not searched for by anyone. The first error costs time, the second may cost a life.

What is the Uncertain tab?

A person whom the gate register still considers present does not disappear from the list, but goes to the Uncertain tab with a reason. Example reasons are a last entry older than 12 hours, or an exit scan that was refused. The marshal therefore sees not only the name, but also why the system is not sure.

Why does someone disappear from the list after many hours?

The automatic closing of stays runs every 3 hours, and the default maximum stay without an exit scan is 12 hours. An entry closed automatically is not a scanned exit, so for night shifts it is worth checking the threshold in the settings.

What the list does not decide

The list does not replace the decision of the evacuation commander or the plant fire procedure. It does not indicate the escape route, does not change the duties of designated persons and does not confirm that a person who left is safe. It provides evidence of the state of presence, on which people can base their decisions.

Illustrative calculation: a building with 6 groups on the list and one sheet per group means 6 sheets. If the commander hands them to the marshals at the assembly point, and each of 4 marshals checks about 30 people, that is around 120 people checked in parallel instead of one long list read in order. This is a numerical example, not a measurement from a real drill.

Video

Frequently asked questions

Does the list work if someone entered without a scan?

The list is based on recorded scans, so a person without a scan will not appear on it. That is why the procedure for entry without a scan should be closed within the plant, and security should know the exceptions.

Can the printout be made after an alarm?

The printout is prepared for handing out at the assembly point. A good practice is also to have a ready copy for drills, to check the legibility of the sheets and the order of the groups.

Who is responsible for the Uncertain tab?

The group marshal together with security: people from this tab are checked separately, because the system is not sure of their presence.

Does the list show the floor?

The list shows presence on the plant premises. Information about the floor requires additional data, which the plant must implement separately.

Check the evacuation list before a drill

We will show how the list, the groups and the printout look on a scenario of a plant office building. Book a conversation with OHS and security.

Let's talk