Why a parallel path is necessary
Employee consent as a basis for processing biometric data raises doubts because of the imbalance between the parties to an employment relationship, so it requires particular caution and a genuine alternative. A genuine alternative means: available at once, without any loss to the employee, and just as quick at the gate.
Consent must be freely given, specific, informed and unambiguous (Article 4(11) GDPR). Without an alternative it is hard to demonstrate that consent was freely given, so the parallel path also protects the employer.
Stage 1: choosing the medium
The options are 13.56 MHz contactless cards with DESFire-type encryption and QR codes on a badge. For most plants they are an alternative to biometrics for entry control to areas with an ordinary level of protection.
InnerWeb does not sell cards or access control readers. The card is bought from the access control system supplier, while the QR badge is issued by the platform: every employee may have a badge with a unique, random QR token, and the badge history is kept.
Time to issue the alternative medium, target example
Stage 2: issuing and linking to the account
HR creates or updates the employee's account, and security issues the medium. In the platform, a scan of the QR badge or of an RFID card on the security panel gives a verdict on whether the person may be on site, based on valid training, qualifications, a work permit in progress and an active account.
At the training station, the account search for an RFID card requires at least 3 characters, returns up to 13 results and does not reveal the card number. A QR scan does not log the person into training by itself: the tablet shows whom the code belongs to, and training starts only after confirmation by a person.
Stage 3: integration with the existing access control system
If the plant has an access control system with biometric readers in some zones, card and finger check-ins go to the same log. InnerWeb receives events from the access control system via a webhook and links them with qualifications, permits, attendance and time records.
An event may consist of a person identifier and a timestamp, so for the platform it makes no difference whether the check-in came from a card or from biometrics. The REST API with JWT authentication and webhooks support integration, while connectors to specific systems require implementation work.
Stage 4: exceptions, cancellation and records
A lost card is cancelled in the access control system, and a badge in the platform: cancelling issues a new one and the history is kept. Scans at the gate create the mobile time record (mRCP) and an evacuation list refreshed every 13 seconds.
The same mechanism covers employees who withdrew their consent to biometrics during employment. Switching them to a QR code requires no changes to the time records or to the permits.
Stage 5: information and evidence
Article 13 GDPR requires that the employee be informed about the purpose, the legal basis, the retention period and the rights. A message about biometrics must contain clear information about the alternative and state that choosing it has no consequences.
Attach to the documentation a list of the people on the parallel path (numbers only, no names in general materials), the time the medium was issued, and proof of deletion of the template for the people who withdrew their consent.
Video
Frequently asked questions
Is a QR badge as secure as an encrypted card?
For ordinary areas it is sufficient, because the token is unique and random, and cancelling issues a new one. In zones of particular protection, the result of the risk assessment decides.
Is an employee on the alternative path marked in the documents?
It is enough to record the method of entry. The reason does not have to be written down, and the choice must not have consequences.
Does InnerWeb require replacing the readers?
No. The platform integrates with the existing access control system and complements it, without replacing readers.
Sources
Launching an alternative path for employees?
We will show QR badges, the admission verdict on the security panel and the intake of events from the access control system. Book a demo.
Let's talk