InnerWeb
Skip to main content

FAQ: fingerprint at work and GDPR. What an employee can know and refuse

A production employee asked to press a finger to a reader at the site entrance has every right to ask about the legal basis, the purpose and the alternative. Below we have collected the most frequent questions, with answers based on the GDPR and the Polish Labour Code.

Art. 9
GDPR: prohibition of biometric identification and its exceptions
13.56 MHz
frequency of contactless cards with encryption as an alternative
Source: card standard

Is a fingerprint personal data and why does it matter

Yes. Biometric data is personal data resulting from specific processing of physical, physiological or behavioural characteristics of a person, which allows that person to be uniquely identified (Article 4(14) GDPR). A fingerprint used to enter the site meets this definition, because it serves to recognise a specific individual.

The practical significance is large: processing biometric data for the purpose of uniquely identifying a person is in principle prohibited (Article 9(1) GDPR). The prohibition is lifted only by the exceptions in Article 9(2), and the employer must indicate which one it relies on. A home address or an employee number does not trigger such a prohibition, which is why biometrics is treated more strictly than a card or a QR code.

Does the reader store a picture of my finger

Usually not. A biometric template is a mathematical representation of features, not a picture of the fingerprint. This does not change its legal status: the template is still personal data, because it is used for unique identification.

An employee should ask where the template is stored: in the reader itself, on the server of the access control system, or on a card carried by the person. This is a question about the place of storage, because the GDPR requires data protection by design (Article 25) and technical and organisational measures adequate to the risk, including encryption and access control (Article 32).

It is also worth asking who among the administrators has access to the template database and how long templates are kept after the employee leaves.

Employee questions by number of answer paragraphs in this material

Employee questions by number of answer paragraphs in this materialHorizontal bar chart showing how many answer paragraphs are devoted to each employee question.0123sectionsPersonal dataPersonal data: 2 sections2TemplateTemplate: 3 sections3Legal basisLegal basis: 2 sections2ConsentConsent: 3 sections3InformationInformation: 2 sections2AlternativeAlternative: 2 sections2
Source: Own breakdown of the material structure

On what basis can the employer require this

Article 22(1b) of the Polish Labour Code regulates the processing of an employee's biometric data by the employer and links it to access control to particularly important information or to premises requiring special protection. The provision does not serve general convenience, for example checking in at the main gate.

An employer that wants to use biometrics for its employees must demonstrate that the solution is necessary for the access control purpose, and not merely convenient or cheaper. The employee has the right to ask which room or resource the requirement concerns and why a card or a QR code is not sufficient.

Do I have to give consent and can I withdraw it

Explicit consent is one of the exceptions in Article 9(2) GDPR, but it must be freely given, specific, informed and unambiguous (Article 4(11) GDPR). If refusal means losing access to work, it is hard to speak of a free choice.

Employee consent as a basis for processing biometric data raises doubts because of the imbalance between the parties to an employment relationship. It therefore requires particular caution and a genuine alternative. In practice this means the employer should offer another way in, and a refusal must not lead to any sanction.

If consent is the basis, the employee may withdraw it. After withdrawal the employer should switch the employee to another method and delete the template, as described in the checklist in a separate material.

What must the employer tell me when collecting the data

Article 13 GDPR requires that the employee be informed about the purpose, the legal basis, the retention period and the rights when their data is collected, including biometric data. The information must be provided before the fingerprint template is taken, not after the fact.

Ask four questions: what exactly the reader is for, which legal provision is the basis, how long the template will be kept and to whom it may be disclosed. A missing answer to any of them is a signal to contact the data protection officer or the trade unions.

What is the alternative to a fingerprint

For most areas of a plant the realistic alternatives are contactless cards at 13.56 MHz with DESFire-type encryption and QR codes on a badge. Encrypted cards and QR codes are a sufficient solution for most plants when controlling entry to areas with an ordinary level of protection.

In the InnerWeb system, a scan of the QR badge or an RFID card on the protection panel gives a verdict on whether the person may be on site, based on valid training, qualifications, a work permit in progress and an active account. Every employee may have a badge with a unique, random QR token; cancelling it issues a new one and the badge history is kept.

Does the InnerWeb system collect my fingerprints

No. InnerWeb is a software manufacturer. It does not produce or supply access control readers, including biometric ones, but integrates with the client's existing access control system. The system receives a check-in event from the access control system in the form of a person identifier and a timestamp, without any biometric template or any body characteristics.

This distinction matters for the employee: even if the plant has a biometric reader in one zone, the data on attendance, training and permits on the platform does not require passing on any template. InnerWeb works as an independent system supplementing the client's existing systems, without GPS.

Video

Frequently asked questions

Can the employer dismiss me for refusing a fingerprint?

If the basis is consent, refusal cannot lead to a sanction, because consent must be voluntary. The employer should offer another method of entry, for example a card or a QR code.

Can I see my biometric template?

You have the right to ask what data is processed and where. A template is a mathematical record, not an image, so the employer will usually show information about its existence, its storage location and its retention period.

Does the InnerWeb attendance system require my fingerprint?

No. The platform receives a person identifier and a timestamp from the access control system, or a scan of a QR badge. It does not need a biometric template.

Whom do I contact when the employer does not answer my questions?

The data protection officer in the plant, and then the supervisory authority. Information on the rights of individuals is available at uodo.gov.pl.

Sources

Looking for an alternative to biometrics at your plant?

We will show you how a QR scan and events from the access control system connect with qualifications, permits and attendance without processing biometric templates. Book a conversation or a demo.

Let's talk