Emergency entry at the plant gate when the biometric reader fails

A biometric reader at the gate rejects an employee or stops working, and a queue builds up in front of the gate. Security needs a backup procedure that does not lower control and leaves a trace in the records. Below are implementation notes: what to prepare before a failure, not after it.

13 s
refresh interval of the evacuation list
Source: InnerWeb feature
2
scanning stations for the peak in the assumption
Source: example calculation

Why a backup procedure is part of the project

A biometric reader rejects people with damaged skin, wet hands or gloves, and devices can fail through power, network or software problems. Without a backup procedure, security decides on the spot, often under queue pressure, and the level of control drops.

Article 22(1b) of the Labour Code requires demonstrating the necessity of biometrics. A plant that cannot let employees in when the reader fails has an additional argument that control based solely on a fingerprint is neither necessary nor operationally safe.

What to prepare at the gate

The procedure consists of several elements that must be ready before the first failure.

Badge with a QR code or RFID card

Each employee can have a badge with a unique, random QR token. Revoking it issues a new one, and the badge history remains. The badge is a way of entry when the fingerprint fails and requires no collection of any biometric data.

Security panel with a verdict

Scanning the QR badge or RFID card on the security panel gives a verdict on whether the person may be on site, based on valid trainings, qualifications, a permit in progress and an active account. The guard does not need to remember the rules, only reads the result.

Searching for an account without a card number

When an employee has no badge, security can search for the account. The search requires at least 3 characters, returns up to 13 results and does not reveal the card number, so no leak of identifiers happens along the way.

Record in the attendance log and evacuation list

QR scans at the gate create the working time record and an evacuation list refreshed every 13 seconds. This way the emergency entry creates no gap in attendance, and in case of evacuation the list covers the people who entered through the backup procedure.

People processed in 30 minutes, example

People processed in 30 minutes, exampleBar chart: 150, 300 and 450 people processed in 30 minutes with one, two and three stations.0100200300400500people1 station: 150 people150 people1 station2 stations: 300 people300 people2 stations3 stations: 450 people450 people3 stations
Source: Example calculation: 6 seconds per person, that is 5 people per minute per station.

How the emergency entry proceeds

The sequence below should fit within a dozen or so seconds per person, so that no queue forms.

  • the employee reports the rejection or the lack of response from the reader
  • security scans the QR badge or RFID card on the panel
  • the panel shows a verdict: entry allowed or the reason for refusal
  • the entry is recorded in the attendance log and the evacuation list
  • security notes the reader failure in a report to the KD vendor

InnerWeb's role and the limits of responsibility

InnerWeb is a software producer and does not manufacture or replace readers. Repairing a reader belongs to the KD system vendor. InnerWeb provides the security panel, the verdict based on trainings and permits, and the gate records.

A QR scan does not log a training on its own: the tablet shows whose code it is, and the training starts after a person confirms it. The same principle of human confirmation applies to the emergency entry: security sees whom it lets in.

Example calculation: failure time and queue

With 300 employees entering in a 30-minute peak and an average of 6 seconds per QR scan, one guard handles about 5 people per minute, that is 150 people in 30 minutes. Two scanning stations are therefore needed to handle the peak. These are illustrative assumptions.

The plant can recalculate its own values and decide how many emergency stations should be on standby. Without such a calculation the procedure exists only on paper.

Video

Frequently asked questions

Does the emergency entry lower the level of protection?

It need not. The verdict on the panel is based on trainings, qualifications and permits, and the entry goes to the log.

What about people without a badge?

Security can search for the account with at least 3 characters. Results are limited to 13, and the card number is not revealed.

Does InnerWeb repair readers?

No. Readers belong to the plant's KD system and are maintained by its vendor.