Two sources, two different questions
Passive RFID records a passage through a gate or a read point, not a continuous position, and it requires the tag to be brought close to the reader. It answers the question: who passed this point and when. BLE answers the question: where is this person now, based on the signals of many transmitters averaged on the map.
Mixing these roles leads to two errors. The first is requiring the gate reader to provide position information in the hall, which it cannot give. The second is using BLE location as proof of passage through the gate, when a card swipe is what serves that purpose.
Practice 1: the card swipe remains the evidence of entry and exit
The gate passage event, recorded by the existing access control system, remains the source of truth about entry and exit from the plant. InnerWeb does not replace that system: it is an independent system that complements the client's existing systems, and it does not manufacture or replace access control readers.
It is good to pass gate events to the location system so that the beginning and end of a person's presence on site are marked. Do not duplicate this event in a second register kept manually by security.
Split of roles: which source answers which question (number of questions in a sample procedure)
Practice 2: BLE location starts where the gate ends
After entering the site, a person's position comes from BLE transmitters: on plant roads about every 100 m, and inside buildings at 1 per 100 to 200 m2. As a result, in case of an alarm it is known not only that the person entered the site, but where they are. The system works without GPS, which has no signal inside buildings.
If the plant has several gates and zones with different permissions, place transmitters at each of them so that the position at the gate agrees with the swipe event. A discrepancy between the two sources should be treated as a signal to check the configuration.
Practice 3: one list of people on site
Security and the dispatcher should see one list of people present on site, built from card swipes and confirmed by BLE position, not two inconsistent lists. When the card shows an entry but the tracker shows no signal, it is a prompt to check: the device was left in the changing room, the battery ran out, or the person left through another gate.
The system tracks the battery status and device state in the heartbeat, so some of these cases become visible before security reports them.
Practice 4: a separate process for guests and external companies
Guests and employees of external companies often do not have a plant card. For them, the path is registration at the entrance and a device with a transmitter for the duration of the visit. This pattern makes it possible to cover with location people who are not covered by card-based access control, and to keep the list of persons present consistent in case of evacuation.
Practice 5: decide who is responsible for discrepancies
Decide whether security, maintenance or the IT department is responsible for discrepancies, and record this in the procedure. Also specify a response time, for example checking a discrepancy within one shift, and the way the explanation is documented. Without assigned responsibility, discrepancies accumulate and after a few weeks nobody trusts either list.
When the two sources are first connected, plan an observation period, for example two weeks, during which the security team compares the gate list with the location list and records discrepancies. Such a period makes it possible to establish typical causes, for example a device left in the changing room, and to record them in the procedure before the system goes into the dispatcher's daily work.
Checklist
Video
Frequently asked questions
Does BLE replace the card swipe at the gate?
No. The card swipe remains the proof of passage, and BLE provides a continuous position after entering the site. The two sources complement each other.
Does InnerWeb supply gate readers?
No. InnerWeb does not manufacture or replace access control readers. It integrates with the client's existing system.
What to do when the card shows an entry but there is no location signal?
Check the battery status and device state in the heartbeat, then establish whether the person left through another gate or left the device behind. Record the result in the event log.
How to handle guests who do not have a card?
Register them at the entrance and issue a device with a transmitter for the duration of the visit, so that they appear on the shared list of persons present.
Connect the gate to location
We will show how events from the existing access control system connect with BLE position on one list of people present. Book a conversation with the InnerWeb team.
Let's talk