Do office employees have to carry a transmitter?
The system does not require this. The online map shows people whose position is tracked, while an internal employee without tracking still appears in the gate register if they enter through a QR scan. The scope of tracking is the site's decision: some companies track only production and risk zones and leave offices in the entry register.
For HR and IT this gives a simple design rule: decide separately who has a position on the map and who is visible on the evacuation list. The second set is always wider, because it covers everyone who has passed the gate.
How does the system determine which floor an employee is on?
The system determines a person's level in turn from the level of the location, then the line, then the area, and the building volume first from the link to the area, then from a point inside the outline. If the first source gives no answer, the next one is checked, so data from a less precise source still allows a floor to be identified.
In a mixed office and production building this translates into specific preparatory work: every floor must have its level defined in the map editor, and locations must be assigned to it. Without this the system has nothing to derive the level from.
Order in which a person's level is determined
Why does a double click on the building not show the floors?
Entering a level from the online map works only when linking building volumes to area data is switched on. By default this function is off, so without enabling it a double click will not show the floors. This is the most common reason for reports of the kind: the floors are in the editor, but they are not on the map.
For IT the checklist is short: the function is enabled, the volume is linked to an area, and there are at least two levels in the building. The level selector appears only when there are two or more levels, and the labels in the Polish version are P, 1, 2 and so on.
What happens to people whose position is not tracked?
Such a person has no show-on-map button, but stays on the evacuation list if the gate register counts them as present. An empty map after a click would be worse than no button, because it would suggest the person is not in the building, so the system does not offer that option.
For HR this matters when communicating with employees: lack of tracking does not mean dropping out of the evacuation procedure. It only means the person is searched for by group and department, not by a pin on the floor plan.
Who is in the Uncertain group in offices?
In offices the Uncertain group mainly concerns people who entered and did not leave through the gate, for example by forgetting to clock out. An entry older than 12 hours with no exit is placed in this group, and the default window is 24 hours. Such an entry is not an accusation of error, only a signal to check.
From an HR perspective the useful rule is that the system prefers to show too many people rather than too few. A person listed by mistake costs an unnecessary search, but a person left out is someone nobody looks for.
Is the online map used to edit the building structure?
No. The online map is a view of the interior: it highlights, describes and lets you go deeper, but it does not edit the structure or assign risks. Changes to buildings, levels and labels are made in the map editor, which has separate permissions.
This separation makes work in a large building easier: the dispatcher and security use the view without the risk of an accidental change, while the map administrator is responsible for the source data.
Video
Frequently asked questions
Can offices and production have different tracking rules?
Yes. The site sets the tracking scope, and the evacuation list still covers everyone who has passed the gate. The only difference concerns whether a person has a pin on the floor map.
What should be prepared before floors appear on the map?
The plan of each level, the names of the levels and the link between the building volume and an area. Linking building volumes to area data must also be switched on, because it is off by default.
Will the system report an employee on a floor that is not in the map?
The system does not guess the level without data. If the level cannot be determined from any source, the person gets no floor preview but remains in the attendance register.
Let us plan the floors of your building
We will go through the tracking scope and the data needed for the floor map with your IT and HR teams, and then show it on a sample building.
Let's talk