What temperature range does the transmitter work in?
The operating temperature range of the InnerWeb industrial beacon is -40 to 60 degrees Celsius. This covers an unheated outdoor yard, unheated warehouses and most production halls. The beacon has an industrial design and a CE declaration, and in its ATEX version it is intended for zones 2 and 22.
It is worth distinguishing air temperature from the temperature at the mounting point, however. A housing mounted right next to a furnace, a flue duct or a hot surface faces different conditions than the same housing a few metres away under the roof. The site survey therefore measures the temperature at the mounting point, not only the hall average, and moves the transmitter to a place where the 60 degree limit is kept with a margin.
Does process dust in a steelworks shorten the life of a transmitter?
Dust acts on the housing and on the signal itself. A layer of deposit on the surface should not reach the level that blocks service access or covers the transmitter. The InnerWeb beacon is built for industrial use, but the honest answer is that dust conditions are set for the specific location and, where combustible dust is present, are linked to the plant's Ex zone classification.
Transmitters in the ATEX version are approved for zones 2 and 22. Certification for zones 1 and 21 is commissioned for the client's installation, with no promised lead time. The Ex zone range for the transmitters must be checked against the plant's zone classification project before the choice of version is made.
Average transmitter current draw by interval
How long does a transmitter battery last?
The beacons run on industrial batteries for several years, and the exact time depends on the broadcast interval. In current consumption measurements, a 500 ms interval gave an average draw of 16 µA and 4 to 5 years until the cells need replacing. A 250 ms interval gave 31 µA and about 3 years, and a 150 ms interval gave 50 µA and about 2 years.
The data show a relationship that the maintenance manager should know before buying: shortening the interval by half roughly doubles the current draw and shortens the period between replacements. A shorter interval gives more frequent signal samples, so it may improve location responsiveness, but at the cost of the cells. Choosing the interval is a decision about balancing response speed against service cost.
Who replaces the cells and what does it cost?
Replacing transmitter cells is a service task. In one maintenance offer it was included in the subscription at about every 4 years, which fits within the 4 to 5 year range for the 500 ms interval. Under this model the plant does not plan a separate purchase of cells or a separate pool of crew hours.
For the maintenance department, it matters that the replacement schedule follows from the configuration and not from ad hoc failures. Transmitters installed at height, above cranes or in zones with limited access need planned service windows. That is why it is worth marking hard-to-reach locations already at the design stage and, where the process allows, planning a longer broadcast interval for them.
- 500 ms: average draw 16 µA, 4 to 5 years to cell replacement,
- 250 ms: average draw 31 µA, about 3 years,
- 150 ms: average draw 50 µA, about 2 years.
How do you count replacements over a 5-year horizon?
For example, at a 500 ms interval the cells are replaced once within 5 years (after 4 to 5 years). At 250 ms, one replacement (after about 3 years; the second cycle would fall after 6 years). At 150 ms, twice (after about 2 and 4 years). This is an illustrative calculation based on the current draw measurements. The actual time depends on operating temperature, cell type and configuration.
The chart alongside shows the average current draw at three intervals. For transmitters in low temperatures, where cell capacity drops, the schedule should be adjusted downwards and confirmed with the service team.
Checklist
Video
Frequently asked questions
Can a transmitter withstand 60 degrees next to a furnace?
The working range goes up to 60 degrees Celsius, but what counts is the temperature at the mounting point. A transmitter next to a hot surface is moved to where a margin is kept.
Is the 150 ms interval worth the shorter battery life?
Only if the process requires faster location response. At 150 ms the draw rises to 50 µA, and the cells are replaced about every 2 years.
Is cell replacement a hidden cost?
It does not have to be. It is a service task that can be included in the maintenance subscription, as was done in one offer at about every 4 years.
Does ATEX cover zones 1 and 21?
The ATEX version covers zones 2 and 22. For zones 1 and 21, certification is commissioned for the client's installation, with no promised lead time.
Let's match the interval and version to your hall
Talk to InnerWeb about temperature, dust and the cell replacement schedule for the specific mounting points in your plant.
Let's talk