What the evacuation list shows
The evacuation list shows who is on site right now. It refreshes every 13 seconds and prints one page per group. There are six groups: guests, couriers, suppliers, employees, external contractors and uncertain persons. For the drill coordinator, these are six sheets to hand to the people responsible for the assembly points.
The list is deliberately designed to show too many people rather than too few. A person missing from the list is someone nobody looks for during a fire, so the coordinator should not treat extra names as an error, but as a task to check at the assembly point.
Before the drill: completeness of the list
The most important test is whether each of the six groups has a page on the printout. A page may be empty, but it must be there, because a missing page means nobody checked whether the group has people in it. In a print shop, couriers and external contractors who come in briefly and are not in the employee register are the ones most often forgotten.
The second test is the Uncertain tab. An entry without an exit scan older than 12 hours lands there, and automatic check-out runs every 3 hours. Before the drill it is worth reviewing this tab and explaining each entry, so that during the drill no time is lost on people who left long ago.
- The printout has six pages: guests, couriers, suppliers, employees, external contractors, uncertain persons.
- The Uncertain tab has been reviewed and explained before the drill.
- The printer has paper and toner, and the printout has been checked shortly before the drill hour.
Time parameters of the evacuation list
During the drill: assembly points
During the drill the coordinator collects the printout and hands out the pages. Each group has a separate assembly point, and the person responsible for the group ticks off those present. The result is compared with the printout: people on the list who are not at the point are reported immediately.
At a packaging plant where we implemented guest registration by phone, safety videos in language versions and groups with a separate assembly point, these groups were one of the elements of the solution. The pattern is universal and carries over to a print shop: the smaller the group, the faster the tick-off.
An uncertain person: what next
A person from the Uncertain tab is checked last, but they are checked. The coordinator asks the supervisor, the gate and colleagues from the last shift. If nobody saw them, the coordinator treats them as a person whose whereabouts are unknown and passes this to the emergency services. This follows the rule that the list should show too many people rather than too few.
After the drill: conclusions and corrections
After the drill the coordinator records two numbers: how many people were on the list and how many were ticked off at the assembly points. The difference is a measure of the quality of the list, not an assessment of people. If the difference repeats in the same group, the problem lies in the exit scan at the gate, not in the drill.
Conclusions are recorded briefly: what worked, what did not, who makes the correction and by when. The evacuation list provides audit evidence of the state recorded at a given moment and supplements the evacuation procedure, but does not replace it.
What the evacuation list does not do
The list does not sound the alarm and does not lead people to the exits. It is a tool for counting and searching, not for directing an evacuation. InnerWeb is a software producer, and the alarm, emergency lighting and signs remain the responsibility of the plant.
The data on the list come from guest registration, scans at the gate and events from the access control system that the plant already has. The more accurately these scans are performed, the more faithful the printout.
Checklist
Video
Frequently asked questions
Does the printout have to be refreshed by hand?
No. The list refreshes every 13 seconds, so a printout made shortly before the drill shows the current state.
Why are there more people on the list than the staffing shows?
Because the list deliberately shows too many people rather than too few. A person missing from the list is someone nobody looks for during a fire.
What goes into the Uncertain tab?
Entries without an exit scan older than 12 hours. Automatic check-out runs every 3 hours.
Let us run the drill with a complete list
We will show the evacuation list with six groups on sample data and help you put together a drill checklist for your plant.
Let's talk