Before the first day starts
A good first day starts the day before, with the invitation. A person invited to the system receives one message with one link and sets the password on their own. The process includes the introductory training, so the new employee does not have to search for instructions in several emails or wait for someone to create the account by hand.
HR teams that focus on equipment and paperwork often forget one thing: an office employee at a production plant is on its premises just like an operator. They pass the gate, the car park and the route to the building, and they may end up near the hall. That is why questions about the minimum OHS rules are not a formality for the office, but part of the same duty owed to every employee.
Does office staff also need the introductory training?
Yes. The Polish Labour Code (Kodeks pracy) requires the employer to provide occupational safety and health training to employees, including introductory training before admission to work. The scope and form depend on the position, but the obligation does not skip administration. Common content for the office usually covers escape routes, behaviour on the plant premises, alarm signals and the assembly point.
Why do I receive an invitation instead of a ready account with a password?
The person sets the password, so nobody else knows it and it does not have to be passed on by email or on paper. For HR this means fewer manual tasks, and for the employee one path: click the link, set the password, complete the introductory training.
Registration and the kiosk
The most frequent question on the first day is where to report. At a plant with a registration kiosk the answer is short: at the kiosk. An unattended kiosk equipped only with a scanner welcomes a trained person, and plays the introductory training to a person who has not been trained yet. The new employee does not have to wait for a free receptionist or a trained supervisor.
What happens when I scan the code and I do not have the training yet?
The kiosk plays the introductory training. The person completes it on site and is then treated as trained. HR does not need printouts or attendance sheets with signatures, because the result is saved in the system together with the employee's qualifications.
Who can operate the kiosk, and can an outsider switch it?
Access to the kiosk is protected by a token, which the administrator can change in the settings. If the token leaks or the arrangement of workstations changes, the administrator replaces the token without touching employee data. It is worth deciding who in the company holds this authority and recording it in the IT procedure.
Will the office employee receive a badge?
The QR badge is primarily a reception tool for visitors: reception registers the visitor and prints the badge in one action, and the visitor receives an identification number and an assignment to a company from the registration settings. A permanent employee usually identifies with the card or code that the plant already uses. InnerWeb does not manufacture access control readers and does not replace the employee card system, it complements it.
HR time to introduce one office employee
Questions about the hall and zones
On the first day an office employee often wants to see production. That is understandable, but the decision does not depend on curiosity, it depends on the plant procedure.
Can I enter the hall in my first week?
The answer depends on the arrangements made by the plant. The system stores the qualifications and training results of each employee, so HR and OHS can see whether a given person has valid medical examinations and the right training for work in a given zone. Lack of qualifications means no entry, not an exception granted at the request of a supervisor.
Who checks my qualifications when I receive a work permit?
When a work permit is created, the system automatically checks whether the assigned employees have the required qualifications. For the office this matters when an engineer or a quality specialist is to carry out a task on an installation. The check happens at the moment the document is created, so it does not rely on the memory of the shift manager.
What do I say to someone who asks what they can access in the system?
The Administrative employee role has access to work permits (list and opening), reports, companies and visitors, and to inviting internal employees. It has no access to system settings, teams and alerts. This division gives a clear answer: the office sees what it needs to do its work and does not change the configuration.
Questions about deadlines and expiry
A new employee usually does not ask about deadlines, but after a few months it becomes a problem for HR. It is worth answering this on the first day.
How will I know that my medical examination or training is about to expire?
InnerWeb warns in advance before medical examinations and trainings expire. Warnings go to the employee and to the employer, and the number of days of advance notice results from the configuration of the installation. HR sets it during deployment, for example so that there is time to book a visit with the occupational medicine doctor and a date for periodic training.
What does the training look like: I watch a video and then take a test?
It depends on the mode. In classic mode there are materials before the test (video and PDF in the chosen order), followed by one final test. In scenario mode the training consists of steps: each step selects a material, draws questions from the topic and requires a set number of correct answers. A failed step repeats the material.
Can I cheat the test because the player knows the answers?
No, because the pass assessment takes place on the server side, and the player does not receive the scoring of the answers. In scenario mode a pass is recorded only after all steps are completed and any material after the test has been viewed.
What HR says at the end of the first day
At the end of the day it is worth repeating three things: where the building assembly point is, who to ask about visitor invitations, and what the next periodic training looks like. A good FAQ does not replace a conversation, but it shortens it and makes the answers the same for everyone, no matter who runs the onboarding day.
Illustrative calculation: if HR spends 25 minutes introducing one office person without system support, and there are 40 new people a year, that is about 17 hours. Moving the repeated questions into the invitation and the kiosk can free most of that time. This is an example based on assumptions, not a measurement from a specific plant.
Checklist
Video
Frequently asked questions
Can the introductory training be done at home?
The introductory training is meant to prepare for work on the plant premises, so the plant decides on the place and form. The kiosk allows completing it on site, without supervision by the reception staff.
What if an employee does not pass the test?
In scenario mode a failed step repeats the material, and a pass is recorded only after all steps are completed. In classic mode the final test is repeated according to the rules set by the plant.
Does the system replace the employee access card?
No. InnerWeb is an independent system that complements the existing systems of the plant, including access control, and it does not manufacture readers.
Who sets how many days before expiry the warning is sent?
The number of days results from the configuration of the installation, so the administrator sets it together with HR and OHS during deployment.
Sources
Organise the first day of new employees
We will show the invitation, the kiosk and the introductory training on a production plant scenario. Book a conversation about the deployment for HR and OHS.
Let's talk