Why a checklist
The Polish Labour Code (Kodeks pracy) requires the employer to provide occupational safety and health training to employees, including introductory training before admission to work. Administration is not an exception here, but a group in which the obligation is easiest to postpone, because desk work does not look dangerous. A checklist enforces the order and leaves a trace.
The list is deliberately short. Each item has one answer: yes or no. Items with an answer need no further conversations, only completion.
Invitation and account
The first item concerns the invitation. A person invited to the system receives one message with one link and sets the password on their own, and the process includes the introductory training. HR should check that the invitation has been sent, ideally the day before the start, so the person can go through the basics before entering the premises.
For administration staff the role is important: the Administrative employee role has access to work permits, reports, companies and visitors and to inviting internal employees, without access to system settings, teams and alerts. The role should match the position.
Checklist items by owner (HR, OHS, IT)
Training mode and test
Introductory training can run in two modes. In classic mode the materials (video and PDF in the chosen order) come before one final test. In scenario mode the training consists of steps: each step selects a material (PDF pages or a video fragment), draws questions from the topic and requires a set number of correct answers, and a failed step repeats the material.
OHS should decide which mode applies to administration and record it in the procedure. For most office positions the classic mode is sufficient, while the scenario mode is justified when the training has separate blocks, for example general rules and the hazards of a specific zone.
Kiosk and token
If the plant uses a registration kiosk, check that it is switched on and available in the lobby. An unattended kiosk equipped only with a scanner welcomes a trained person, and plays the introductory training to an untrained one. Access to it is protected by a token, which the administrator can change in the settings, so control of the token belongs to the IT department or the system administrator.
For this item what matters is not the value of the token, but who changes it and when it was last changed. The answer should be written in the procedure, not known to a single person.
Record of the pass
The last item concerns evidence. The pass assessment takes place on the server side, and the player does not receive the scoring of the answers. In scenario mode a pass is recorded only after all steps are completed and any material after the test has been viewed. HR and OHS therefore check not whether the person finished the video, but whether the pass appears in the system.
A comment on the whole: the list does not guarantee compliance with regulations, it provides evidence of the state of affairs for an audit. The employer is responsible for the scope and form of the training.
Checklist
Video
Frequently asked questions
Is the scenario mode mandatory for the office?
No. The choice of mode belongs to the plant and OHS. The scenario mode makes sense when the training has separate blocks.
What if a person does not pass a step?
In scenario mode a failed step repeats the material, and a pass is recorded only after all steps are completed.
Who is responsible for the content of the training?
The employer is responsible for the scope and form of the training. The system stores the materials and records the results.
Sources
Close the introductory training for administration
We will go through the checklist with HR and OHS on a plant scenario. Book a conversation about the introductory training.
Let's talk