InnerWeb
Skip to main content

Induction training for an office worker: the first scan at the reception kiosk

A new employee from the purchasing department starts on Monday morning, and the production plant requires induction training before the person may enter the site. Below is a step-by-step scenario: what happens from the first scan at the reception kiosk, through the training, to the moment the person appears on the evacuation list.

1
message with one link to the account and the training
Source: feature card: system invitation
22 min
example time until the employee is ready to work
Source: example calculation

Starting point: a scenario for a production plant

We describe an implementation scenario, not the history of a specific client. A production plant hires a new person in the purchasing department. The position is an office role, but the office is on the plant site, so the employee passes the gate, the halls and the internal roads. The Labour Code obliges the employer to provide occupational health and safety training, including introductory training before admission to work.

For the health and safety department this raises a concrete question: on the first day, does someone have to sit with the new person and make sure they watch the material and pass the test, or can the process run on its own, with proof of training recorded in the system? The scenario assumes the second option.

Step by step: from the invitation to the scan

The day before the start, the HR department or a person with the right permissions invites the new employee to the system. The invited person receives one message with one link and sets the password themselves, and the process includes the induction training. There are therefore no separate emails about the account, the password and the training that the employee would have to piece together alone.

At the entrance: the reception kiosk

On the first day the employee scans their code at the reception kiosk. The unsupervised kiosk, equipped only with a scanner, greets a person who has been trained, and for an untrained person it starts the introductory training. Our new employee has no training yet, so the kiosk starts it straight away, without involving the reception or the health and safety department.

Access to the kiosk is protected by a token, which the administrator can change in the settings. In this way not every phone on the plant network can impersonate the kiosk, and changing the token is an administrator task that does not require calling the service team.

Training: steps and test

In scenario mode the training consists of steps. Each step selects a piece of material, that is PDF pages or a video fragment, draws questions from the scope and requires a set number of correct answers. If a step is failed, the material must be repeated. The completion is recorded only after all steps are passed and any material after the test has been watched.

The assessment of the completion takes place on the server side, and the player does not receive the scoring of the answers. From the health and safety point of view this matters: nobody can read in the browser which answers were correct, so the next person at the kiosk cannot copy the key.

Time of successive first-day activities: example calculation

Time of successive first-day activities: example calculationHorizontal bar chart: scan and training start 2 minutes, video 12 minutes, test 8 minutes.02.557.51012.5minScan and training startScan and training start: 2 min2VideoVideo: 12 min12TestTest: 8 min8
Source: Example calculation based on the assumptions in the Day scenario section

On the list from the first scan

A person who scanned at the training station is on the evacuation list from the moment of the scan as present in training, even though the station does not record entry to the site. This closes the classic gap of the first day: someone sits at the kiosk, an evacuation is announced during the video, and the list does not yet know that this person is in the building.

For the safety manager this also means certainty that induction training does not create a temporary gap in the records. The training station does not record entry to the site, but the first minutes of a person in the plant are already visible on the list.

Day scenario: an example timeline

The timeline below is an assumption for planning, not a measurement. We assume the video lasts 12 minutes, the test 8 minutes and a possible repetition of one step 6 minutes. The values depend on the plant's materials and can be changed in the training configuration.

The assumption is that scanning the code and starting the training takes 2 minutes, the video 12, the test 8, and the conversation with the supervisor about the position, which takes place after the training, is already outside the system. In total the employee is ready to work after about 22 minutes, without involvement from the reception.

  • The message with the link and setting the password the day before the start,
  • scanning the code at the kiosk on the first day and automatic start of the training,
  • the film or PDF pages, then questions drawn from the scope of the step,
  • recording the completion after all steps are passed,
  • entry to the plant site and further conversation with the supervisor.

Conclusions for the health and safety department

The first conclusion: induction training for an office worker should not require a person at the station, provided the materials and tests are prepared at the configuration stage. The second: the kiosk token is a security element, not an extra, so its changes should be entered in the administration schedule. The third: it is good to test the kiosk with a trial account before the first real person arrives.

The fourth conclusion concerns communication: one message with one link shortens the time HR spends answering questions about access. The whole does not replace the conversation with the supervisor, but it removes repetitive tasks from the first day, and those are exactly what creates the queue at reception.

Example calculation

Time from the first day to readiness to work

Assumptions
ParameterValue
Scan and training start2 min
Training video12 min
Final test of the step8 min

Result: In total about 22 minutes from the scan to the completion, without involvement from reception.

Note: Example calculation; the times depend on the plant's materials and do not come from a specific implementation.

Video

Frequently asked questions

Does the reception kiosk require a receptionist to operate it?

No. The unsupervised kiosk, equipped only with a scanner, greets a trained person by itself, and for an untrained one it starts the induction training.

What happens when an employee fails a training step?

In scenario mode a failed step repeats its material. The completion is recorded only after all steps are passed.

Is an office worker on the evacuation list during training?

Yes. A scan at the training station puts the person on the evacuation list as present in training from the moment of the scan, even though the station does not record entry to the site.

Sources

Shorten the first day of a new employee

We will show you how the reception kiosk and step-by-step training work, using an example of your office position.

Let's talk