InnerWeb
Skip to main content

Costs of onboarding new office employees: kiosk or in-person briefing

Forty new office people a year is not many, but each one needs reception time and OHS time. Below is an illustrative calculation: how many minutes an in-person briefing costs, how many a registration kiosk costs (it welcomes trained people and plays the training to untrained ones), and what that means for the hours budget.

30 h
per year, in-person briefing for 40 people
Source: illustrative calculation
5.3 h
per year at the kiosk
Source: illustrative calculation

Two ways of onboarding one person

In the first model the new person reports to reception, waits until someone from OHS is free, takes the briefing in person, and then reception issues a document or access. Two people from the plant spend time on them in the same window, so the OHS calendar sets the pace of onboarding.

In the second model the person reports at the kiosk. An unattended registration kiosk equipped only with a scanner welcomes a trained person, and plays the introductory training to an untrained one. Reception and OHS come back to the matter only when something needs checking or approving. Access to the kiosk is protected by a token, which the administrator can change in the settings.

What stays with reception

Reception still serves visitors: it registers the visitor and prints the QR badge in one action, and the visitor receives an identification number and an assignment to a company from the registration settings. The calculation below concerns new employees, not visitors, so this time remains in both variants.

Illustrative calculation for 40 people a year

The assumptions are indicative and explicit. We assume 40 new office employees a year. An in-person briefing takes reception 15 minutes per person (admission, documents, managing the order) and OHS 30 minutes per person (briefing and record). That is 45 minutes per person, or 1,800 minutes, which is 30 hours a year: 10 hours of reception and 20 hours of OHS.

At the kiosk we assume 3 minutes of reception time per person (showing the kiosk and collecting the badge or confirming) and 5 minutes of OHS time per person (checking the result in the system). That is 8 minutes per person, or 320 minutes, which is about 5.3 hours a year: 2 hours of reception and about 3.3 hours of OHS.

The difference is about 24.7 hours a year. At a full labour cost of 90 PLN per hour (indicative, each plant enters its own rate) this gives about 2,200 PLN a year. The time of the training itself is the same in both variants and has been left out.

Why the numbers are small but still worth knowing

With 40 people a year the saving is visible, but not dramatic. What matters is the distribution: new employees arrive in waves, for example 8 people on a Monday after recruitment. On such a day the in-person model blocks OHS for the whole day, while the kiosk serves people in parallel.

What the calculation does not cover

It does not cover the cost of the kiosk as a device or the time needed to prepare training materials. The materials have to be prepared once and then used many times. It also does not cover a change in quality: an in-person briefing varies depending on the instructor, while training from the kiosk is the same for everyone.

Hours a year for 40 new office employees

Hours a year for 40 new office employeesComparison of hours a year: reception 10 and OHS 20 with an in-person briefing, reception 2 and OHS 3.3 at the kiosk05101520hIn-person briefing (Reception): 10 h10 hKiosk (Reception): 2 h2 hReceptionIn-person briefing (OHS): 20 h20 hKiosk (OHS): 3.3 h3.3 hOHS
  • In-person briefing
  • Kiosk
Source: Illustrative calculation based on the assumptions in the Calculation section

The invitation before the first day

The largest time saving comes from preparing the person before they arrive. A person invited to the system receives one message with one link and sets the password on their own, and the process includes the introductory training. If the new person already has an account on the start day, the kiosk confirms their identity and qualifications instead of starting from zero.

The calculation does not include this additional gain, so as not to overstate the result. It is still worth checking after the first quarter whether reception time has dropped below the assumed 3 minutes.

Indicative implementation ranges

In this model the kiosk is software plus a simple scanner. InnerWeb is a software producer, and the remaining hardware is bought and integrated, so the device is chosen according to its place of installation (lobby, entrance to the administration building). Indicative ranges from 2025 to 2026 implementations; individual quotation.

With 40 people a year the kiosk alone does not pay back within one year if only the hours of new employees are counted. The case for implementation usually rests on combined use: the kiosk also serves people who renew periodic training, and visitors who must complete a short training before entering.

Example calculation

Reception and OHS time for 40 new office employees a year

Assumptions
ParameterValue
New office employees40 people per year
Reception, in-person briefing15 min/person
OHS, in-person briefing30 min/person
Reception, kiosk3 min/person
OHS, kiosk5 min/person
Labour rate90 PLN/h

Result: 30 hours a year with an in-person briefing versus about 5.3 hours at the kiosk: a difference of about 24.7 hours, or about 2,200 PLN a year.

Note: Illustrative calculation based on the assumptions above, not a measurement from a specific plant. Indicative ranges from 2025 to 2026 implementations; individual quotation.

Video

Frequently asked questions

Does the kiosk replace reception?

No. Reception still serves visitors and exceptions. The kiosk takes over the repeatable part of onboarding new people.

What does the kiosk do with a person without training?

It plays the introductory training and records the result in the system among the person's qualifications.

Who can change access to the kiosk?

Access is protected by a token, which the administrator can change in the settings.

Can these figures be applied in my plant?

Yes, as a framework. Simply enter your own number of new people and your measured reception and OHS times.

Compare an in-person briefing with the kiosk

We will put your figures into the calculation and show the registration kiosk on a production plant scenario. Book a conversation with OHS and reception.

Let's talk