How the selector behaves at 13 floors and more
The level selector appears only when the selected building has at least two levels, and the labels in the Polish version are P, 1, 2. Above 12 levels the selector shows a window of 12 buttons with arrows up and down, and the mouse wheel scrolls the list by one level.
For the tester this means the behaviour of the selector in a building with 12 levels differs from a building with 13. The crossing of the threshold must be checked separately, because a test on a small building proves nothing about a large one.
Boundary test: 12, 13 and 32 floors
It is best to prepare three test buildings: with 12, 13 and 32 floors. The first confirms that with 12 levels the selector works without scrolling. The second checks the threshold, the moment the arrows appear. The third shows the behaviour when the list exceeds the window many times over.
The 32-level test building (P and 1-31) did not fit in a 1600 by 900 pixel window, which forced level scrolling. This case is worth repeating on the screens the dispatchers use, because the monitor resolution affects how many levels are visible without scrolling.
What to check in each test
In each of the three buildings the tester should perform the same steps and record the result in a table.
- Whether the selector appears and whether the labels start with P.
- Whether the up and down arrows change the window by 12 buttons.
- Whether the mouse wheel scrolls by one level and not by a whole window.
- Whether the selected level stays selected after scrolling.
Test buildings against the selector window (number of levels)
Entering a person's floor in a tall building
A double-click on the employee opens the building on the floor where that person is. In a tall building this is the most important test, because this path skips the selector scrolling. Check it for people on the lowest level, on a middle level and on the highest level.
The system determines a person's floor in this order: the floor of the location, then the line, then the area, and the building outline is taken first from the link with the area, then from a point inside the outline. If the test shows the wrong floor, start the diagnosis from this chain: which element is assigned and which is empty.
Implementation pitfalls
Three pitfalls come up repeatedly in tall buildings.
- Linking of building outlines with area data is switched off: it is off by default, so without switching it on a double-click does not show floors.
- Different numbering rules in neighbouring buildings, where the same label means a different level.
- A test on one monitor only: the scrolling window may look different on a smaller screen than on the tester's workstation.
Order of work before the dispatchers go live
First the building model with its numbering, then switching on the linking of outlines with areas, then the boundary tests, and finally a walk with a person across several levels. Only after that do the dispatchers receive training on the selector scrolling.
The training should cover one thing: do not look for a floor in the selector if you can enter from the person's card. The selector is for viewing levels, not for finding people.
Acceptance record
Record the test results in a protocol: the number of levels of the building, the result of the 12 and 13 threshold, the result of the test on a large number of levels, the result of entering from the person's card for three levels, and remarks about the screen. Such a protocol is evidence that a tall building was checked deliberately, and not assumed to work the way a small one does.
Video
Frequently asked questions
From how many floors does the selector need scrolling?
Above 12 floors. The selector then shows a window of 12 buttons with arrows up and down.
How do I scroll the list of levels?
With the up and down arrows or with the mouse wheel, which moves the list by one level.
Why is a double-click on the person enough in a tall building?
Because a double-click on the employee opens the building on their floor, so it skips the selector scrolling. It is the fastest route during an alarm.
Testing a tall building?
We will prepare with you a scenario of boundary tests for the selector and for entering from the person's card. Book a call.
Let's talk