InnerWeb
Skip to main content

Updating the plant plan after a hall rebuild

A hall rebuild changes its outline, but it should not change the history of the facility. A building on the map can be moved or corrected without losing the zones, lines and risks assigned to it. Below are practices for the maintenance manager who updates the plant plan after a physical change.

0
zones, lines and risks lost when the outline is corrected
Source: card

Why you should not redraw the building from scratch

The most common reflex after a rebuild is to delete the old outline and draw a new one. That is a mistake, because the new object does not inherit what was assigned to the previous one: its zones, lines or risks. A saved building outline can instead be moved or corrected with the button "Move / fix solid". The building remains the same object and keeps its zones, lines and risks.

After you drag the outline, the "Finish placement" button appears above the object being moved and saves the new position. The building stays selected, so the manager immediately sees that the change concerns the right object and can move on to further corrections.

The order of actions after a rebuild

The order below limits the risk that old data remains on the map after the change. Each step corresponds to one decision that the maintenance manager makes.

1. Identify the building, do not draw a new one

Find the saved building that has changed. Check whether the rebuild changed only the outline or also the internal layout. In the first case it is enough to correct the solid; in the second, also update the floors and zones.

2. Correct the outline with "Move / fix solid"

Drag or correct the outline to its new shape and finish the placement. The building keeps its zones, lines and risks, so after saving they do not need to be linked again.

3. Check the link with the solid from the file

The building solids come from one GeoJSON file per plant, and what the user draws or names in the editor is stored in the database and linked with the file. Uploading the file again does not delete manual work. A building drawn in the editor owns its geometry, while a building describing an existing solid from the file keeps the more accurate outline from the file.

4. Verify the one-solid rule

After the changes, check the consistency rule: one area is exactly one solid on the online map. If one building has been split into two after the rebuild, the map should reflect this with two areas.

5. Look at the online map

Open the online map and enter the corrected building with a double-click. Check that the floors, names and zones are in place, and that the walls in front of the camera lower to 1 m.

Building assignments after a rebuild: two ways of updating

Building assignments after a rebuild: two ways of updatingBefore and after chart: drawing from scratch keeps 0 percent of assignments, correcting the outline keeps 100 percent.020406080100% of assignments keptDrawing from scratch (Zones and lines): 0 % of assignments kept0Correcting the outline (Zones and lines): 100 % of assignments kept100Zones and linesDrawing from scratch (Risks): 0 % of assignments kept0Correcting the outline (Risks): 100 % of assignments kept100Risks
  • Drawing from scratch
  • Correcting the outline
Source: Map editor documentation: correcting the solid keeps zones, lines and risks; a new object does not inherit them

What this approach protects

Risk assignments to a building are part of the safety documentation. When the outline changes but the assignments remain, the continuity of that documentation is preserved: permits issued after the rebuild still refer to the same facility. For the person responsible for maintaining the plant plan this is a practical benefit, because they do not have to rebuild the links by hand.

It is worth recording every plan update in a change log: the date of the rebuild, the building, the scope of the change and the person who corrected the outline. This makes it easier to establish later why a permit issued earlier points to a different shape of the building than the current one.

Pitfalls when updating

The first pitfall is uploading the solids file again in the hope that everything will update by itself. The file supplements the solids, but it does not change the outline of a building drawn in the editor, because that building owns its geometry. The second pitfall is naming the new part of the hall the same as the existing one, which breaks the rule of unique names.

The third pitfall is changing the outline without checking the floors. If the rebuild added a mezzanine, a floor must be added so that the floor selector shows it to users. The selector appears only when a building has at least two floors.

Checklist

Video

Frequently asked questions

Will I lose the zones and lines if I move the outline?

No. The building remains the same object and does not lose its zones, lines or risks.

What does the "Finish placement" button do?

It appears above the object being moved after you drag the outline, and it saves the new position. The building stays selected.

Will uploading the GeoJSON file again delete my corrections?

No. Manual work is stored in the database and linked with the file, and uploading the file again does not delete it.

Who owns the geometry of a building?

A building drawn in the editor owns its geometry. A building describing an existing solid from the file keeps the more accurate outline from the file.

Keep the plant plan in line with reality

We will show how to correct a building outline after a rebuild, using your plan as the example. Book a conversation with the deployment team.

Let's talk