Printing machine service on a digital work permit

Servicing a printing machine by an external company starts with preparing the workstation, not with the main job. The concept below shows how the maintenance department of a printing plant opens a permit in which the service engineer has two preparatory tasks before starting the actual repair.

2
preparatory tasks in the template concept
Source: example calculation
04:00
daily cut-off time for working time
Source: card

Situation: the machine manufacturer's engineer in the hall

The concept applies to a printing plant where a printing machine needs an inspection carried out by a service engineer from an external company. The maintenance department is responsible for making sure the engineer reaches the correct workstation, holds valid authorisations, and that nobody starts the machine during the work. On paper this is usually one sheet with signatures, on which it is hard to see what has already been done and what is still missing.

In the digital approach the service is described as a permit created from a template: it has a location, tasks and a status. As a result the maintenance department sees on one screen the stage the engineer has reached, and security knows whether this person is cleared to work or is still preparing the workstation.

Two preparatory tasks before the main work

The permit template can contain preparatory tasks. In the concept there are two: securing the machine against unintended start-up, and switching off and marking the area around it. A permit without preparatory tasks goes straight to the main work after approval, whereas with preparatory tasks it first moves to the status in preparation.

This division has a practical meaning. The service engineer cannot skip to the main work, because the status does not allow it, and the maintenance department has proof that the preparatory tasks were ticked off by the person who did them. The template should be designed once and then used for every machine of this type.

Number of formal steps before the main work (example calculation)

Number of formal steps before the main work (example calculation)Before and after chart: 6 steps to check by hand on paper, 2 in the digital permit.0246stepsPaper: Steps to check by hand: 6 steps6 stepsPaperDigital permit: Steps to check by hand: 2 steps2 stepsDigital permit
Source: Example calculation: assumption of 6 steps on paper, of which the system controls 4 through the status

What the engineer sees: a green frame means clearance

On the contractor's card, green frames and the label Working mean only clearance to the main work, not merely joining the crew. This is an important distinction: an engineer who has joined the permit and is still in the preparation phase does not see the green signal. Security and the shift supervisor can, on this basis, stop anyone who tries to start the main work without clearance.

In a printing plant where several machines work side by side, a clear signal on the service engineer's phone is a simpler safeguard than having to remember who already has permission and who does not.

Working time and the daily cut-off

The working time of a person on a permit is counted from joining, or from starting in the location, to the end, the closing of the permit, the expiry of the term, or the daily cut-off at 04:00. After the cut-off the working lists are restored as invited, so a service engineer who works on the next day must start work again.

For printing machine service that takes several days, this has two consequences. First, the settlement of working time is clear for each day. Second, nobody remains on the working list only because they forgot yesterday to close the task. The maintenance department should agree with the service engineer that starting work each day is a separate, conscious action.

Conditions and limits of the concept

The concept does not describe an implementation at a specific client, only a rule that can be built into a permit template. Before launch, one must decide on the number of preparatory tasks, who confirms them, and the location of the permit on the hall map. It is also worth rehearsing one full cycle with a cooperating service engineer before the template reaches all suppliers.

The system does not replace the machine manufacturer's procedures: it supports their enforcement and provides audit evidence that the preparatory tasks were completed before the main work.

  • Design a template with two preparatory tasks and one location.
  • Name who confirms the completion of the preparatory tasks.
  • Tell the service engineer that the green frame means clearance to the main work.
  • Set the rule for restarting work each day after the 04:00 cut-off.

Video

Frequently asked questions

Are preparatory tasks mandatory in every permit?

No. A permit without preparatory tasks goes straight to the main work after approval. Tasks are added to the template where the type of work requires them.

Can the service engineer see that he or she is cleared?

Yes. Green frames and the label Working on the contractor's card appear only after clearance to the main work.

What happens to the working list the next day?

After the daily cut-off at 04:00 the working lists are restored as invited, so the work requires starting again.