Guest invitation channel: email, SMS or personal link

An invitation carries a single activation link, but the route by which it reaches a person varies: email, SMS or personal handover. The system follows a fixed order of these channels. The plant administrator working with many companies should know it and prepare the data so that nobody is left without a link.

7 days
validity of the activation link
Source: system function documentation
3 channels
email, SMS, personal link
Source: system function documentation

Who this concerns and why it matters

At a plant with many external companies, some people have a work email address, some only a phone, and some have neither that is available to the plant. A driver, a temporary agency worker or a service engineer from abroad: each of them must receive the same activation link.

An invitation carries a single activation link valid for 7 days. Opening the link does not use it up, so it can be opened repeatedly until it expires. This matters because with a shared phone or a broken connection the first attempt often fails.

Order of channels in the system

The delivery channel for an invitation works in order: email comes first, an SMS with a short link is the backup, and without either of them the operator receives the link to pass on in person. You do not choose the channel for each person manually: the system takes the first one available.

  • Email: when the account has an address, the invitation is sent by email.
  • SMS with a short link: when there is no address but there is a phone number.
  • Link to pass on in person: when neither is available, the operator sees the link and hands it to the guest.

Delivery channels for 60 invited people

Delivery channels for 60 invited peopleDonut chart: 36 people receive email, 18 receive SMS, 6 receive a link to pass on in person.Email: 36 people (60%)SMS: 18 people (30%)Personal link: 6 people (10%)60peopleEmail36 people (60%)SMS18 people (30%)Personal link6 people (10%)
Source: Illustrative calculation: 60 people, own assumptions

Six recommendations for the administrator

The recommendations concern a plant with many external companies, where the system administrator is responsible for making sure the invitation actually reaches the person and is not merely generated in the panel. Each of them follows from the system behaviour described above and can be checked on a few test accounts before the start.

1. Always collect a phone number

A personal email address may change, while a phone number is more stable. For each person from an external company, collect both details where possible.

2. Check the system's response, not only that the account was created

The system's response about an invitation distinguishes creating the account from delivering the invitation. The account exists even if the email was not delivered, and the operator sees that the delivery channel is none. The message that an account was created does not mean the guest has the link in hand.

3. Pass the link on in person to those without a channel

For people with neither email nor phone, decide who passes the link on: the coordinator, the host or the guard. Without a designated person the link stays in the panel and nobody sees it.

4. Match the email content to the type of company

The email content depends on the type of company: an internal employee receives a short welcome with an activation button, while a person from an external company also receives the plant address, a route map and an optional training section. Check that the address and map are current.

5. Remind about the 7-day deadline

An expired or used link does not end in a 404 error, but in a redirect to the login page with a message. The invited person can request a new password link, so this is not a disaster, but you save time when guests know the deadline.

6. Do not expect the password straight away

After the link is clicked, the system checks the state of the account: an outstanding training, then any joining of work, and finally setting the password. The invited person needs exactly one email, but does not have to finish everything in one session.

Illustrative calculation: where invitations get lost

Let us assume 60 people invited from external companies, of whom 36 have an email address, 18 only a phone, and 6 neither. This is an assumed example, not a measurement at a specific plant. In this setup, email serves 36 people, SMS 18, and the personal link requires handing over to six. If the administrator does not check those six, they are left without a link, that is 10 percent of the group.

Do the same calculation for your own plant before the first wave of invitations: count the people with an address, the people with only a phone, and the people with no channel at all. The third group requires human work, so its size determines how much time the operator must reserve on the start day. Record the result in a short note and attach it to the implementation plan, so that after a week you can compare the plan with the actual number of links handed over in person.

While doing this, check whether the contact data comes from a current source. A list of contractors from a year ago contains addresses that no longer exist, and an invitation sent to such an address looks like a success in the panel. It is best to compare the list with the coordinator of each external company and ask them to confirm the phone numbers of people without email.

Checklist

Video

Frequently asked questions

Does the link work only once?

No. Opening the link does not use it up. It can be opened repeatedly until it expires after 7 days.

What if the email was not delivered?

The account exists, and the operator sees that the delivery channel is none. The operator then passes the link on in another way.

What does a person with an expired link see?

A redirect to the login page with a message, not a 404 error. They can request a new password link.