Where password tickets come from
For a guest a password is an obstacle out of proportion to the purpose: they arrive for a single meeting, and the system requires them to create an account, remember a password and later reset it. Each such step is a potential help desk ticket, usually at the worst moment, which is at the gate.
In a model where entry does not depend on a password, this class of tickets disappears. A guest who has completed the training but has not set a password is admitted through the gate like an active account, and on the lists has the status No password. The password is needed only to log in to the system.
What remains with IT
A passwordless account is not an account without control. The training remains a condition of entry, and the status No password is visible on the lists, so IT and security can see who has not completed activation. This distinguishes a guest who enters the plant from a user who logs in to the system and really needs a password.
Tickets do not disappear completely. Cases of an expired link (valid for 7 days) remain, as do accounts with two-factor authentication which, after the password is set, return to the login form. An expired or used link does not end with a 404 error, but with a redirect to login with a message, so the invited person can request a new password link on their own.
- Guest after training without a password: entry works, the status No password appears on the lists.
- Expired link: a message and a request for a new password link without IT involvement.
- Account with 2FA: return to login after setting the password is intended behaviour.
Guest password tickets per month (sample calculation)
Cost structure of guest support on the IT side
The cost of tickets consists of the time of the consultant, the time of the guest and the host, and the delay at the gate. The first component can be counted from the ticketing system, the others require an estimate. For the IT manager the most important thing is how many tickets a month concern guest passwords themselves.
Indicative ranges from 2025-2026 implementations do not include this item, because it depends on the plant's password policy; individual quote. The sample calculation below serves for comparison with your own data from the ticketing system.
How to reduce tickets even further
It is good to match the delivery channel of the invitation to the guest's contact details: email comes first, an SMS with a short link is the backup, and without either of them the operator receives the link to pass on in person. The system distinguishes creating the account from delivering the message, so IT can see that the account exists even when the email was not delivered.
It is also worth preparing a short instruction for the help desk on the order of screens after clicking the link: training, possible joining the work, password. After the password is set the person is logged in automatically, which removes tickets about re-entering data.
Sample calculation: guest password tickets
| Parameter | Value |
|---|---|
| New guest accounts per month | 120 accounts |
| Share of tickets when a password is required for entry | 15 % |
| Share of tickets when entry is possible without a password | 2.5 % |
| Time to handle a ticket | 12 min |
Result: 120 times 15% = 18 tickets, and after the change 120 times 2.5% = 3 tickets. The difference of 15 tickets at 12 minutes each is about 3 hours of IT work a month, which is 36 hours a year.
Note: Sample calculation based on the assumptions above; the ticket shares are assumptions, not a measurement. Your own data should be taken from your plant's ticketing system.
Video
Frequently asked questions
Will a guest without a password really get through the gate?
Yes, if they completed the training. They are treated as an active account, and on the lists they have the status No password.
When does a guest have to set a password?
Only when they need to log in to the system. A password is not needed to enter the plant itself.
What about an invitation that did not arrive by email?
The account exists, and the operator can see the delivery channel. They can use an SMS with a short link or pass the link on in person.
Reduce the number of IT tickets
We will put together a calculation from the data of your ticketing system. Book a conversation with the InnerWeb team.
Let's talk