How many driver locators a plant needs: pool calculation

A plant with a dozen deliveries on the yard at once needs a pool of locators larger than the number of vehicles, because some devices are on the charger. With 12 deliveries, 2 locators per delivery and a 25% reserve, this gives 30 units. It is an illustrative calculation that the plant can redo with its own figures.

30
locators in the illustrative pool for 12 deliveries at the same time
Source: illustrative calculation
25%
pool reserve for charging (illustrative assumption)
Source: illustrative calculation

What the size of the pool depends on

The number of locators depends on four quantities: how many drivers are on the yard at the same time, how many locators one delivery requires, how long a device takes to return to circulation after being issued, and how many units are being charged or offline at any moment. Only putting these numbers together shows how many devices must be kept in the gate drawer.

The deliveries and appointments module manages vehicles entering the plant: choice of gate, dock or warehouse, driver and closing the delivery. A locator is tied to a delivery, so the demand follows from how many deliveries are running at the same time.

Assumptions of the illustrative calculation

We assumed figures for a plant with intensive delivery traffic. These are assumptions, not a result from a deployment.

  • 12 deliveries on the yard at the same time.
  • 2 locators per delivery, because two drivers arrive.
  • 25% reserve for charging.

Locator pool against the number of simultaneous deliveries

Locator pool against the number of simultaneous deliveriesBar chart of the locator pool: 20 units for 8 deliveries, 30 for 12, 40 for 16.010203040pcs8 deliveries: 20 pcs20 pcs8 deliveries12 deliveries: 30 pcs30 pcs12 deliveries16 deliveries: 40 pcs40 pcs16 deliveries
Source: Illustrative calculation: 2 locators per delivery and 25% reserve

Result: 30 locators

Locators in use are 12 deliveries times 2, which is 24 units. A 25% reserve of 24 is 6 units. The pool in total is 30 locators.

The reserve is needed because the service tab shows devices that are offline or have a battery at 5% or below, with a recommendation to charge. The duty officer should not issue such a locator to the next driver, so at any moment part of the pool is on the charger.

What changes when there are more deliveries

With 16 deliveries at the same time and the same assumptions, the pool is 32 in use plus 8 in reserve, which is 40 units. Each additional simultaneous delivery raises the pool by 2.5 locators, rounded up at purchase.

Is a 25% reserve a good number?

It is an illustrative assumption, not a value from a deployment. If charging is short and duty officers swap devices on the spot, the reserve can be reduced. In the first weeks the plant should check how many units are offline or below 5% at the same time, and match the reserve to the actual number.

Pool scope: limited to the gate transmitters

The locator pool is limited to the transmitters of the gate, meaning devices assigned to the gate where the driver collects the locator. This way the duty officer does not see devices from another gate and does not issue them by mistake.

At a plant with several gates, the pool is counted separately for each one. The sum of gate pools can be larger than the number of deliveries at the same time across the whole plant if traffic is uneven.

Practical tip: count the pool for peak hours, not for the daily average. The peak of deliveries, for example in the morning after the gates open, decides whether the last driver in the queue gets a locator or waits for the return from the previous one. A plant that counts the pool from the average usually undercounts it by a few units and discovers this only at the first peak after launch.

How to treat costs in the calculation

InnerWeb is a software vendor, and locators and multi-chargers are equipment that the plant buys and integrates. The price of the equipment is set individually, so this article does not give a price per unit, to avoid giving the plant a number it cannot verify.

The cost of the pool is the number of units times the unit price of devices and chargers. Multiply the pool from the calculation by the price in the offer, and add the capacity of the chargers, so that all locators from the reserve fit into the sockets.

When comparing offers, check whether the price includes multi-socket chargers and how many sockets they have. A pool of 30 units without room to charge the 6 reserve units does not meet the assumptions of the calculation, because the reserve then lies discharged in a drawer.

Example calculation

Locator pool for deliveries on the yard at the same time

Assumptions
ParameterValue
Deliveries on the yard at the same time12 deliveries
Locators per delivery2 pcs
Reserve for charging25 %

Result: 24 units in use plus 6 units of reserve, 30 locators in total.

Note: Illustrative calculation, not a result from a deployment. The price of the equipment is individual and is not part of the formula.

Video

Frequently asked questions

Why is the reserve 25%?

It is an illustrative assumption for charging and offline devices. The plant adjusts it after the first weeks, by checking in the service tab how many units are below 5% battery.

Is the pool counted for the whole plant?

The pool is limited to the transmitters of the gate, so with several gates it is counted separately for each one.

Does every driver need a locator?

In the illustrative assumptions one delivery requires 2 locators, because two drivers arrive. The plant sets this according to its own delivery practice.

We will calculate the pool for your yard

We will put the number of simultaneous deliveries and gates at your plant into the calculation. Book a conversation with the InnerWeb team.

Let's talk