InnerWeb
Skip to main content

Clean zone entry: eight questions from the quality department about guests and service

The quality assurance manager usually asks the same things: whether a visit bypasses training, who is responsible for the health declaration, what stays on record as evidence and until when the document is valid. Below are eight answers based on how the entry gate works in the InnerWeb system, marking what is a plant setting and what is a system rule.

5
channels for submitting a declaration
1
declaration row per person per day

Questions about the guest health declaration

The health declaration is a condition of entry in the system, not a box ticked after the fact. A guest without a declaration for today does not get in, and the entry is not recorded. This answers the typical auditor objection: there is no path where a person is already inside and the paperwork is filled in the next day.

1. Does a planned visit skip training and qualifications?

No. A planned visit is equivalent to a one-day work permit, without a time slot, and applies to people from external companies who come without work, for example for a meeting, a quote or measurements. At the gate it removes only the work permit requirement. Training, qualifications and an active account still decide entry, and passed training does not replace the declaration, because entry after group training under supervision is checked by the same declaration gate.

2. Who signs the declaration, and who is exempt?

The declaration applies to incoming guests and people from external companies. Internal employees and accounts without a company are exempt, because the document concerns guests. The template wording, taken from the BRC requirement, refers to no infection in the last 14 days and to reporting wounds, skin problems or digestive complaints. At a pharmaceutical plant the plant itself defines the wording of the declaration, for example in line with its own hygiene procedures and staff requirements.

3. Can the wording of the declaration be adjusted to our procedure?

Yes. The text is a plant setting in the form of a text field, with an optional English version for accounts with a language other than Polish. An empty field means a general text without the plant name. Each declaration stores a SHA-256 hash of the text the person actually saw in their language, so a later change to the text does not rewrite history, and it can be shown under which wording the guest signed.

Questions about evidence and validity for the day

The quality department assesses a process by what can be shown to an inspector. Two elements matter most here: when the document loses validity and exactly what stays in the record.

4. For which day is the declaration valid?

For one calendar day in the Europe/Warsaw time zone. A declaration signed yesterday at 23:59 is invalid today, and one signed today at 00:01 is valid until midnight. There is therefore no rolling window such as "24 hours from signing", which would be hard to explain on a night shift. For the shift supervisor the rule is simple: a new day means a new declaration.

5. What is the evidence, and will duplicates spoil the register?

The database holds one declaration row per person per day. Confirming again on the same day returns the first entry, so parallel submissions from two channels cause no error and no duplicate. The evidence is the row with the date, the person and the text hash, and for an oral confirmation also the information about who confirmed it.

Time windows in guest handling

Time windows in guest handlingHorizontal bar chart: oral confirmation 5 minutes, host phone group reset 3 minutes, silence before the group call 0.5 minutes.012345minOral confirmation after theanswer "declaration required"Oral confirmation after the answer "declaration required": 5 min5Reset of the host phone groupReset of the host phone group: 3 min3Silence before the group callSilence before the group call: 0.5 min0.5
Source: and

Questions about channels, the host and language

Guests and service staff do not arrive in one mode. Some register in advance by phone, others stand at the gate, and some do not speak Polish. The system provides several routes, but they always end at the same gate.

6. Where can the declaration be submitted?

Through five channels: at the gate station, at reception, in the security panel, during training on a phone or kiosk, and in the LivePermit portal. For training and the portal, the person must be verified: a code from the invitation, an active badge or card. The user ID alone is not enough and ends with error 403. This protects against submitting a declaration on someone else's behalf.

7. Who is responsible for the guest on site?

The host. Every visit has a host, meaning an active internal employee. When a guest first enters on the day of the visit, the dispatcher calls the host once, without retries. A host without a phone number receives one e-mail instead of a call, provided they have an e-mail address. For QA it matters that responsibility has a name, rather than being spread between security and reception.

8. What about a guest who does not speak Polish?

The language of the declaration comes from the person's account. When entering from a link with a code, a badge or a card, the interface switches to the account language, and when choosing from a form, the choice made by the person applies. If training in the account language is missing, the gate requires training in Polish instead of skipping it, so a missing translation does not open a shortcut.

How to set up the process to pass an audit

The declaration requirement is switched on in the administrator panel and is disabled by default. For a pharmaceutical plant this means a deliberate decision: someone from the quality department approves the wording, enables the requirement and checks it with an acceptance test. The EU GMP guidelines (EudraLex, Volume 4) cover the chapter on personnel and Annex 1 on the manufacture of sterile medicinal products, whose revised version applies from 25 August 2023. The system does not replace these documents or the plant's procedures. It provides evidence that the entry procedure was carried out on a given day.

A good practice is a short review before the first inspection: draw three guests from the last week and for each show the declaration, the host, the training and the entry record. If all four elements can be pointed to within a minute, the process is ready for the auditor's questions.

Video

Frequently asked questions

Is the declaration required from plant employees?

No. Internal employees and accounts without a company are exempt, because the document concerns guests and people from external companies.

Can the declaration requirement be enabled only at a selected installation?

Yes. The requirement is switched on in the administrator panel and is disabled by default, so other installations work without changes.

Can a guest leave without a declaration?

Yes. The declaration is required only at entry, and a person already on site can always leave, so they do not remain on the evacuation list until the night checkout.

Is a planned visit enough to enter a clean zone?

No. A visit replaces only the one-day work permit. The declaration, training and an active account are still checked at the gate.

Sources

Let's walk through the entry process together with your quality department

We will show in a demo how the gate treats a guest without a declaration and what the record that stays for the auditor looks like. Book a conversation with the InnerWeb team.

Let's talk