GMP inspection: who was in the zone, implementation scenario

The inspector asks about a guest from a week ago: who invited them, whether they had training and whether they signed the health declaration on that day. Below is an implementation scenario for a pharmaceutical plant where the QA manager answers this question from the gate register in a few minutes, not from folders of paper.

6
groups on the evacuation list, refreshed every 13 seconds
25 Aug 2023
start date of the revised EU GMP Annex 1

The question that has to be answered on the spot

This is an implementation scenario for a pharmaceutical plant, not a description of a completed inspection. We start from a typical situation: the inspector goes through the documentation and stops at an entry about a person from outside who was in the cleanroom a week earlier. They ask who let the person in, on what basis, and whether the person met the hygiene requirements on the day of the visit.

The EU GMP guidelines (EudraLex, Volume 4) include the chapter on personnel and Annex 1 on the manufacture of sterile medicinal products, whose revised version has applied since 25 August 2023. The plant does not have to quote them from memory, but it must be able to show that access to the zones is controlled and that it can be reconstructed.

What the QA manager usually has at hand, and what is missing

Typically this is the reception visitor book, the attendance list for hygiene training and copies of declarations in a binder. Each of these documents covers a different part of the guest's path and is kept in a different place. Reconstructing a single day means combining three sources, and a declaration may be signed but with no certainty that it applies to that day.

There is also a gap in the text: if the wording of the declaration was changed during the year, it is hard to show which version the guest actually read. For an inspector, this is the difference between a document and a declaration.

Sources needed to reconstruct a day: paper and one register

Sources needed to reconstruct a day: paper and one registerChart: three paper sources against one gate register.0123sourcesBook, training list, binderBook, training list, binder: 3 sources3One gate registerOne gate register: 1 sources1
Source: Example calculation: three paper documents described in the section on what QA has at hand.

The solution: one register with declaration, training and entry

In this scenario, entry to the cleanroom passes through a gate that checks the daily declaration. The database holds one declaration row per person per day, and confirming again on the same day returns the first entry. Two parallel submissions from different channels do not create a duplicate or an error, so the register stays readable.

Each declaration is stored with a SHA-256 hash of the text the person saw in their language. A later change of text in the plant settings does not rewrite the history: a row from a week ago points to exactly the text that applied at that time. A passed training does not replace the declaration, so the register never shows a case where training 'covered' a missing declaration.

Reconstructing the day step by step

The QA manager opens the day a week earlier and establishes three facts. First: who invited the guest, or who was their host. Second: whether a declaration exists for that person on that day, and through which channel it was signed. The channels are the gate station, reception, the security panel, training on a phone or kiosk, and the portal. Third: whether the entry was recorded, that is, whether the gate reached the end of the path.

The evacuation list is built from QR scans at the gate and divides people into six groups. When in doubt, it shows too many people rather than too few. This matters for questions about who was on site at a given moment: the register is built conservatively.

  • The guest's invitation and host.
  • The declaration for the day of entry and the channel it was signed through.
  • The entry record, or the lack of one when the gate responded.
  • The training and its language.

What the register does not do

The register does not replace a quality decision and does not judge whether a person could enter a specific cleanroom class. InnerWeb provides evidence of what the gate checked and what the system recorded, while the assessment of compliance with the guidelines stays with the plant. We also do not promise that the inspection will go without remarks.

When the gate requires a declaration and it is missing, the system does not record the entry and does not create a refusal entry in the SIEM log. For QA this means that the absence of a refusal entry is not proof that no attempt was made: the trace of an attempt is in the gate register, not in the security log. It is good to write this down in the instructions before someone from outside asks about it.

Conclusions

Preparing for an inspection starts with the question 'what can we reconstruct today within five minutes?'. If the answer is 'only from folders', the scenario above shows the direction: one register, a declaration tied to the day and to the text, and a clearly identified host.

A plant that works on paper today can start with one zone and one group of guests, for example the service of equipment. Once the first day can be reconstructed without pulling out folders, the other zones are added in the same way.

Video

Frequently asked questions

Will the register show which declaration text the guest saw?

Yes. The SHA-256 hash of the text in the person's language is stored. A later change of the text in the settings does not rewrite the history.

Does the absence of a refusal entry mean nobody tried to enter?

No. When a declaration is missing, the gate creates no refusal entry in the SIEM log and does not save the entry. The trace of the attempt is in the gate register.

Does the system assess GMP compliance?

No. It provides evidence of what the gate checked, and the assessment of compliance belongs to the plant.