InnerWeb
Skip to main content

Order of gates before the cleanroom: recommendations for quality

A guest who clears three gates and gets stuck at the fourth one in the airlock blocks others and annoys the host. Below are seven recommendations for the quality team on how to arrange the account, training, qualifications, health declaration and visit so that nothing is skipped and every gap is visible before the cleanroom itself.

377 days
maximum advance for planning visits
Source: feature card: Planned Visits
5
channels through which the declaration can be signed
Source: feature card: Health statement

Who these recommendations are for

For the quality department and managers who design the guest path to the cleanroom: from the invitation, through the plant gate, to the airlock. The recommendations describe settings that the system lets you agree on, and an order that reduces situations of 'stuck in the airlock'. The plant can adapt it to its cleanroom classes and hygiene procedures.

Recommendation 1: account and visit set up before the day of entry

Set up the account and the planned visit in advance. Visit planning accepts days from today up to 377 days ahead, at most 34 days at a time; a day that already has a visit is skipped, and another host's visit is not overwritten. For a stable service provider, this means one action at the start of the quarter instead of a request before every entry.

Remember that a visit removes only the permit requirement. If the quality department wants a person without work to be able to enter, the visit is the tool; if the person is to work, a permit is needed.

Visit planning limits and grouping of calls

Visit planning limits and grouping of callsBar chart: visit planning up to 377 days ahead, up to 34 days at a time, declaration valid for 1 day.0100200300400unitsDays ahead (up to): 377 units377 unitsDays ahead (up to)Days at a time (up to): 34 units34 unitsDays at a time (up to)Days the declaration is valid: 1 units1 unitsDays the declaration isvalid
Source: Feature cards Planned Visits and Health statement

Recommendation 2: training before the declaration

Hygiene and induction training should come before the declaration, because the declaration is valid for one day only. A guest who signed it in the morning and passes training in the afternoon may hold a valid declaration and still not get in. A passed training does not replace the declaration, so both gates are independent and both are checked on the day of entry.

Mind the language: when training in the account's language is missing, the gate requires training in Polish instead of skipping it. For international groups, agree on the language versions in advance so that nobody receives training they do not understand.

Recommendation 3: the declaration on the day of entry

The declaration is valid for one calendar day in the Europe/Warsaw time zone: one signed yesterday at 23:59 is not valid today, and one signed today at 00:01 is valid until midnight. That is why the invitation should state clearly that the declaration is signed on the day of the visit, not in advance.

The model wording from the BRC requirement concerns guests in a cleanroom production area: no infection in the last 14 days, and reporting of wounds, skin problems or gastrointestinal complaints. The wording is a plant setting, so the quality department adapts it to its own procedures.

Recommendation 4: a channel for the declaration close to where the guest stands

The declaration can be signed through five channels: at the gate station, at reception, in the security panel, during training on a phone or kiosk, and in the LivePermit portal. Most problems arise when a guest leaves it to the last moment at the gate itself. We recommend that the invitation directs guests to the portal or to training on a phone, with the gate station kept as the emergency channel.

A declaration made during training or in the portal requires proof of identity: the code from the invitation, an active badge or a card. The user ID alone is not enough and returns error 403.

Recommendation 5: the order at the kiosk and in the airlock

The registration point is an unattended kiosk with a scanner: it welcomes a trained person, and for an untrained one it replays the induction training. For a cleanroom this is the right order: the kiosk is the first point and the airlock is the last. Do not set up the declaration check only at the airlock, because then sending a guest back along the whole path takes the longest.

Recommendations 6 and 7: the host and the record on refusal

Every visit has a host, who receives one call from the dispatcher at the first entry. If several guests with the same host arrive within 3 minutes, one group call goes out after 30 seconds of silence, so the host is not called for each of them.

The final recommendation: write into the instructions that, when a declaration is missing, the gate does not record a refusal in the SIEM log and does not save the entry. IT and security should know this rule so they do not look for a refusal where there is none.

Video

Frequently asked questions

Can the order of the gates be changed?

The gate checks the requirements, and the order in which a guest meets them is set by the quality department in the invitation and along the path. We recommend the order described in this text.

Can a declaration be used without training?

No. Training and the declaration are independent gates; a passed training does not replace the declaration, and the reverse is also true.

Do internal employees sign the declaration?

No. The requirement applies to incoming guests and people from external companies; internal employees and accounts without a company are exempt.

Sources

Let us set up the gates for your cleanroom

In the demo we will show the order kiosk, gate, airlock, using the example of a guest and a service technician.

Let's talk