Health declaration at entry only: airlock and guest exit

The health declaration gate applies only to people entering. A person already on site can always leave. Below are implementation notes for the project team: what this means for the airlock, guest exit and the list of people on site, and how to set it up so that nobody stays in the zone until the nightly check-out.

13 s
refresh interval of the evacuation list
6
groups on the evacuation list

The rule: the declaration blocks entry, never exit

The declaration is required only at entry. A person already on site can always leave, so that they do not stay on the evacuation list until the nightly check-out. This is a design decision about safety: the list of people on site has to be conservative, and a guest whose declaration stopped being valid at midnight the day after it was signed must not be held back at the exit.

For the implementation project the consequence is simple: do not design the same gate in both directions. The entry gate checks the declaration; the exit gate only records the exit.

Step 1: mark the entry and exit paths on the plan

On the zone plan, mark the entry point (kiosk, gate, airlock) and the exit point separately. For a cleanroom these are often two different passages: a staff airlock for entry and a separate one for exit, with the traffic going in the other direction. If the reader at the exit airlock is the same as the entry one, set up direction recognition in the access control system, because it determines whether an event is an entry or an exit.

Example: people on the list when exit is blocked and when exit is always possible

Example: people on the list when exit is blocked and when exit is always possibleBefore and after chart: with exit blocked, 4 people stay on the list; with exit always possible, 0.01234peopleExit blocked by a missing declaration: 4 people4 peopleExit blocked by a missing declarationExit always possible: 0 people0 peopleExit always possible
Source: Example calculation: 4 people whose declaration expired at midnight on the night shift; illustrative figures.

Step 2: who is exempt

The declaration applies only to incoming guests and people from external companies. Internal employees and accounts without a company are exempt, because the document concerns guests. Record this in the roles table in the project, so that security does not try to collect a declaration from the plant's own staff. The requirement is switched on with a setting in the administrator panel and is off by default, so the plant switches it on deliberately, for the chosen installation.

Step 3: channels and order in the airlock

The declaration can be signed through five channels: at the gate station, at reception, in the security panel, during training on a phone or kiosk, and in the portal. The airlock should not be the place to sign it: that is where the guest stands in protective clothing, or just before putting it on. Indicate that the declaration is signed earlier, at the kiosk or in the portal, and at the airlock the gate only checks it.

Trap: a person inside whose declaration has expired

The declaration is valid for one calendar day in the Europe/Warsaw time zone, so at midnight validity also ends for people who are still on site. The system does not treat this as a reason to block the exit. For the implementation team this matters for night shifts: someone who entered at 22:00 with a declaration is no longer 'valid' at midnight, but can leave, and at the next entry needs a new declaration.

For training sessions and work that runs past midnight, agree with the quality department whether a new declaration is required when someone re-enters after a break. The rule is the same as for every entry: the gate checks the day.

Trap: the list of people on site and evacuation

The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups. The compromises favor showing too many people. If exit were blocked by a missing declaration, the list would be falsely full. The rule 'declaration only at entry' therefore protects the reliability of the list and has a direct link to people's safety.

Order of work in the project

The recommended order: first the roles table and exemptions, then the entry and exit plan, then the wording and language of the declaration, and finally acceptance tests with a person in the zone whose declaration has expired. During the test, check that exit works, that entry is blocked until a new declaration is given, and that the list of people on site shows a state consistent with reality.

Video

Frequently asked questions

Is the declaration checked at exit?

No. It is required only at entry; a person on site can always leave.

What about a person whose declaration expired at midnight?

They can leave without obstacles. At the next entry they need a declaration signed on that day.

Do employees sign the declaration?

No. The requirement applies to guests and people from external companies, and internal employees are exempt.