Employee Card and QR Badge: What to Issue in a Plant and When

In a plant with access cards, the question arises whether everyone entering should get a card. The answer depends on how often people visit, the risk of the workstation and the cost of issuing. Below are practices that allow QR badges to be kept for guests and short contracts, and cards to be issued where it pays off.

13
maximum number of person search results
Source: karta
3 characters
minimum length of a surname fragment in the search
Source: karta

Two media, one verdict

A scan of a QR badge or an RFID card gives security the same verdict: valid trainings, qualifications for dangerous work, a work permit in progress and an active account. The scan records the entry. The medium is therefore a matter of convenience and cost, not of the level of information about the person.

With RFID card integration, the employee swipes the card, or selects a company and types part of a surname from 3 characters, and the system shows up to 13 results. The search does not reveal the card number, which reduces the risk of misuse on the side of the staff handling it.

When to keep a QR badge

A badge works well when a person comes rarely, for a short time, or in a large group. Typical cases are guests, suppliers, one-off service crews and contractors on a contract of a few days. Registration takes place by phone or at a kiosk, and the code is sent with the invitation.

An employee QR badge has a unique, random token. Revoking it issues a new badge, and the badge history is kept. If a badge is lost, nothing needs to be unlocked in the access control system: it is enough to revoke the previous one.

  • Guests and suppliers with a one-off visit.
  • Contractors on a contract shorter than a few weeks.
  • Training groups with one assembly point.
  • People waiting for their card to be issued.

Example split of media in a plant of 800 people

Example split of media in a plant of 800 peoplePie chart: 600 employee cards, 80 contractor cards, 120 QR badgesEmployee card: 600 people (75%)Long-term contractor card: 80 people (10%)QR badge: 120 people (15%)800peopleEmployee card600 people (75%)Long-term contractor card80 people (10%)QR badge120 people (15%)
Source: Example calculation: illustrative assumptions for a plant of 800 people

When to issue a card

A card is better for people who enter every day, work in zones with elevated risk, or need fast passage through the turnstiles. An encrypted card additionally resists cloning by merely copying the number. For permanent employees and long-term contractors this makes economic sense.

The condition: the card does not replace the access decision. It verifies the identity of the medium, and entry is decided by the permissions on the system side. That is why, whatever the medium, the verdict comes from the same source.

Good operating practices

Set one rule for moving from a badge to a card, for example after 10 working days in the plant or after signing a contract for a longer period. Link the card issuing with the transfer of the training result to the account with the card: on installations with entry cards, the training result is carried over to the account with the card, so that the gate stops reporting a missing training. The system never merges accounts by surname alone, so it is worth checking whether the plant has two accounts for the same person.

When an employee without a valid occupational safety training is scanned at the gate, the system creates an alarm permit and notifies the company coordinator. Calls are aggregated to one per company within a 55 minute window. The same rule applies to the badge and to the card.

Mistakes to avoid

The most common mistake is issuing cards to guests and not collecting them back. The second is leaving badges without an expiry date. The third is different verdict rules for cards and badges, after which security starts to trust one medium more than the other.

Checklist

Video

Frequently asked questions

Is a QR badge as secure as a card?

A badge has a unique, random token and can be revoked. An encrypted card additionally protects against copying the number. However, the same permissions decide entry.

What if a contractor loses a badge?

The old badge is revoked and a new one is issued. The badge history is kept.

Can security see the card number in the search?

No. The search shows people by a surname fragment and company, without revealing the card number.