Situation: a contractor crew at the entrance
A corrugated cardboard packaging plant outsources the service of a production line to an external company. Six people arrive at the entrance: some with a card issued for the duration of the contract, some with a QR badge. Security has two questions. Can this person enter, and can they carry out the work they came for.
The first question belongs to the access control system. The second is broader and concerns trainings, qualifications for dangerous work and the work permit. That is why InnerWeb does not replace the access control system, but adds a layer of permissions on top of it.
Step 1: the access control system accepts the card
The reader and the controller belong to the client's existing access control system. InnerWeb does not manufacture readers and does not replace them. When the card is encrypted, the reader performs mutual authentication with it, and the access control system decides whether to open the passage according to its own configuration.
This stage remains unchanged. What matters is that the access control supplier passes the swipe event on to the complementary system by webhook.
Example distribution of crew swipes in the entry window (people)
Step 2: the event reaches InnerWeb
InnerWeb receives the card swipe event from the access control system and links it with qualifications, work permits, attendance and time recording. At the gate, the screen for security shows a verdict made of four elements: valid trainings, qualifications for dangerous work, a work permit in progress and an active account. Scanning a QR badge or an RFID card records the entry.
For external companies one more thing counts: the search in the RFID card integration lets you select a company and type part of a surname from 3 characters, and results are limited to 13 entries. The search does not reveal the card number, so security sees no more than it needs.
Step 3: when an occupational safety training is missing
If an employee without a valid occupational safety training is scanned at the gate, the system creates an alarm permit and notifies the company's coordinator. Calls are aggregated to one per company within a 55 minute window, so that the coordinator does not receive six calls about one crew.
For security this is a clear signal: the gate is not a bottleneck, and the missing training is handled by the person responsible on the contractor's side. The event stays in the history, which makes a later audit easier.
- Scanning a card or badge records the entry.
- A missing valid training creates an alarm permit.
- The company coordinator receives one notification per company within a 55 minute window.
Step 4: work permit and attendance
When the training is valid and the qualifications match the dangerous work, the screen shows the work permit in progress. Swipe events feed the presence on site and the data for time recording. In one place you can see who is in the plant, who holds a permit for given work, and who entered for the first time.
For a client of the packaging manufacturer type, the integration of swipes from the access control system to time recording works according to the specification handed over to the access control supplier, without InnerWeb readers. This pattern can be extended with permits if the plant needs it.
Why this matters for practitioners
An encrypted card solves the problem of credential identity: copying the number alone is not enough. It does not solve the problem of permissions, because the card does not know that a training expired yesterday. Combining both layers gives security a decision based on facts, and the OHS manager evidence for an audit.
The conclusion from this sequence: one event mechanism is enough for the gate, the permit and the presence to speak the same language. The plant does not change its readers, and the contractor sees the same rules whether they enter with a card or a QR badge.
Video
Frequently asked questions
Does InnerWeb open the doors instead of the access control system?
No. The passage is handled by the client's access control system. InnerWeb receives the swipe event and links it with permissions.
What does security see after a scan?
A verdict made of valid trainings, qualifications for dangerous work, a work permit in progress and an active account. The scan records the entry.
How does the coordinator notification work?
When a valid occupational safety training is missing, the system creates an alarm permit and notifies the company coordinator. Calls are aggregated to one per company within a 55 minute window.