Card scan and entry verdict: security FAQ

A security officer at the gate has no time to read tables: they scan a card or QR badge and need one answer, whether the person may be on the site. Below we have collected the questions security asks most often, with an explanation of what the verdict is made of and why it sometimes shows an intermediate status.

4
components of the entry verdict
Source: internal fact sheet
1
scan gives the verdict and the entry record
Source: internal fact sheet

What the security panel does after a scan

The security panel lets you scan a QR badge or an RFID card and returns a verdict on whether the person may be on the site. The scan itself records the entry, so security does not perform a second action: one operation gives both the check and the trace in the register. This differs from a paper list, where the check and the record are two separate operations.

The verdict is made up of several conditions checked automatically: valid training, qualifications for hazardous work, a permit in progress and an active account of the person. Security sees the result, not the raw data, so the decision at the gate is quick and the same for every shift.

What the verdict is made of

The contractor permit, qualifications and training are linked to the person's account, so the card number becomes the key to checking whether the person has valid OHS training before the gate lets them through. The individual components carry different information and it is worth distinguishing them.

  • Valid training: whether the OHS training required for the given company and place is current.
  • Qualifications for hazardous work: whether the person holds the authorizations required for the assigned work.
  • Permit in progress: whether an active work permit exists for this person.
  • Active account: whether the person is known to the system and has not been blocked.

Why a missing component does not always mean refusal

Not every person enters to work. A planned visit by an external company is equivalent to a one-day permit for people entering without work. It removes only the permit requirement: training, qualifications and an active account still decide on entry. This is a frequent reason for security questions when a visitor gets a different result from a contractor.

How to read the colors on a contractor permit card

On a contractor permit card a green colour and label mean only admission to the main works. The status after joining the crew in the preparation phase is amber and requires confirmation of the preparatory tasks. Security should therefore not treat an amber screen as an error: it means the person may carry out preparatory activities, but not the main works.

The rule for the shift: green allows the main work, amber directs the case to confirmation of the preparatory tasks by the responsible person, and the lack of a positive verdict requires contact with the contractor's supervisor or the coordinator on the plant side.

Two accounts of one person and missing training despite training

The most common complaint is: the person has the training, but the gate reports that it is missing. The cause is often a double registration of the account, for example once when registering a visitor and once from a card punch. When the same person has two active accounts, the system transfers the training result to the account with the entry card, so that the gate stops reporting missing training. It never merges accounts on the basis of the surname alone, so security should not expect automatic joining of people with similar data.

If the result is still negative, security reports the case to the administrator, who checks the accounts by card number. In practice such reports concern mainly staffing agencies with high rotation, where the data in the AC and OHS systems are spelled differently.

What security can switch off and what it cannot

Security does not change the training requirements: those are set by the administrator, for example as a requirement for all companies except the indicated exceptions. Security performs the scan, reads the verdict and makes a decision consistent with the plant's procedure. All scans remain in the entry register, which gives evidence for an audit and for the evacuation list, if the plant uses these functions.

Checklist

Video

Frequently asked questions

Does a scan record the entry?

Yes. Scanning an RFID card or QR badge in the security panel returns the verdict and at the same time records the entry.

What does the verdict depend on?

On valid training, qualifications for hazardous work, a permit in progress and the person's active account.

Does a visit replace training?

No. A planned external company visit replaces only the permit for one day, while training, qualifications and the account still decide.

What does an amber screen mean?

The person has joined the crew in the preparation phase and must confirm the preparatory tasks. Green means admission to the main works.