InnerWeb
Skip to main content

Voice navigation for drivers from abroad: recommendations before switching on

A driver from abroad cannot read a Polish road sign or ask for directions in the local language. Voice navigation in the delivery locator solves this problem, but only if the plant has settled a few things beforehand. We have collected seven recommendations for the security and logistics manager.

10
languages for voice prompts
Source: delivery functions sheet
55 s
validity time of a voice prompt
Source: navigation functions sheet

Who these recommendations are for

We address these recommendations to the security and logistics manager of a large production or warehouse plant that regularly receives drivers from abroad. The typical problem is a driver who stops at a junction of plant roads because he does not know which way his warehouse is, and security has nobody to send as an escort.

A driver with a BLE locator receives voice prompts: turn left, turn right, go straight, make a U-turn, in one of 10 languages. The choice of voice navigation and language is recorded by security at the delivery locator. Before we switch it on, it is worth going through the list below.

Recommendations 1 and 2: understand what navigation is, and set the scope of warehouses

Recommendation 1: do not present the feature as GPS. Voice navigation is not GPS and not live routing. It relies on an editable matrix that defines what to say at a junction for a given warehouse, without fixed routes. If management expects navigation with dynamic detours, this has to be explained at the start.

Recommendation 2: decide which warehouses the matrix covers. Navigation leads to warehouses covered by the matrix. A warehouse outside the matrix receives no prompts, so the list of covered warehouses should be known to security and dispatchers, so that no one promises drivers directions to a place they do not cover.

Voice navigation parameters

Voice navigation parametersBar chart: 10 languages, 100 metres transmitter spacing, 55 seconds prompt validity020406080100countPrompt languagesPrompt languages: 10 count10Transmitter spacing on theroad (m)Transmitter spacing on the road (m): 100 count100Prompt expiry (s)Prompt expiry (s): 55 count55
Source: Voice navigation functions sheet and company facts

Recommendations 3 and 4: delivery data and a test on a real dock code

Recommendation 3: make sure the delivery carries the dock code. A test delivery must have the target dock code entered, because it is the dock code that determines the warehouse. A delivery without a dock code does not know where to lead. In practice this means that appointment data must reach the form in full, which we cover in the article on the appointment integration.

Recommendation 4: test with a delivery whose dock code you know. Run the first test drive with a security officer playing the driver, choosing a language he does not speak, for example one of the 10 available. Check whether the prompt arrives at the point where the driver needs a decision.

Recommendation 5: accept silence where the system is uncertain

The relative direction, meaning left, right, straight or U-turn, is calculated at the moment of passing, from the actual approach segment driven by the driver. When the approach arm is unknown, the system stays silent, because a wrong direction is worse than no prompt. The security manager should know this, because silence at one junction is not a failure.

Each junction speaks once per delivery, and a voice prompt expires after 55 seconds, so that it does not play late after the phone regains coverage. Security should prepare a short instruction: if the driver misses a prompt, he contacts the dispatcher instead of waiting for a repeat.

Recommendations 6 and 7: transmitter infrastructure and the limits of responsibility

Recommendation 6: assess the density of transmitters on the roads. The driver's location relies on signals from several BLE transmitters averaged on the map, without GPS, and plant roads are equipped with transmitters about every 100 m. A junction prompt is announced about one transmitter before the junction, so gaps in the transmitter grid mean gaps in guidance.

Recommendation 7: keep the division of roles. InnerWeb is an independent system that complements the customer's existing systems and does not make appointment hardware. Responsibility for the content of prompts, the choice of languages and the consent to guide vehicles across the plant stays with the plant, while the system provider is responsible for how the software works.

Video

Frequently asked questions

Does voice navigation work like car navigation?

No. It is not GPS and not live routing. The system plays prompts from a matrix configured for the junctions and warehouses of the plant.

Who chooses the language of the driver's prompts?

Security records the choice of voice navigation and language at the delivery locator. There are 10 languages to choose from.

What should a driver do if he misses a prompt?

A prompt expires after 55 seconds, and each junction speaks once per delivery. The driver should contact the dispatcher or security.

Let's check voice navigation on your roads

Book a call about voice prompts for drivers from abroad. We will walk through your junctions and the warehouses the matrix should cover.

Let's talk