Why it is worth counting courier time
A single courier entry takes two minutes and nobody sees a cost in it. Only multiplying by the number of entries in a year shows the scale: with twenty entries a day and 250 working days, reception makes 5,000 entries a year. This is repetitive work, and therefore a good candidate for simplification.
The calculation is not a measurement at a specific plant. It rests on assumptions that reception can verify with a stopwatch in one day. If your values differ, the result changes proportionally, and the conclusion about the direction of change usually holds.
Assumptions used in the calculation
Recording a courier's entry in a paper logbook takes about 2 minutes: finding a free line, writing the data, the time and a signature, and at exit returning to the same line. Registration in the system with a label printout takes about 1 minute. These are assumptions of the calculation, not a measurement.
The calculation assumes 20 entries of small suppliers a day and 250 working days a year. It also adds the activities the system places on reception, so that the calculation is not one-sided: a daily check of the label stock in the printer (2 minutes) and a weekly review of the print list (15 minutes).
The print list as a source of time and savings
The left half of the registration tile shows the people who recently created an account and have never had a printed label. It includes people with training activity from the last 13 days, without an earlier training result and without a printed badge. The list is limited to 89 items and refreshes every 34 seconds, so reception does not need to remember who has not yet received a code.
Courier registration time: logbook and system
- Logbook
- System
Result: how many hours reception gains
In the logbook, 20 entries a day at 2 minutes each gives 40 minutes a day, that is 10,000 minutes a year, about 167 hours. In the system, 20 entries at 1 minute each gives 20 minutes a day, that is 5,000 minutes a year, about 83 hours. The difference in registration alone is about 83 hours a year.
After adding the additional activities, the picture is less optimistic but still favourable. Checking labels is 250 times 2 minutes, about 8 hours, and the weekly review is 52 times 15 minutes, about 13 hours. Together, about 21 hours of additional work. The net saving is about 62 hours a year, roughly 5 hours a month.
What this means in money
At an assumed rate of 70 PLN per hour of reception work, including employer costs, the net saving is about 4,300 PLN a year. This is a modest amount, so it is not the main argument. More important are the effects this calculation does not price: the evacuation list drawn from data rather than from a logbook, and no manual re-keying of entries into the RCP.
When the system may not pay off in time
With only a few entries a week the result reverses: the additional reception activities, the label check and the review, take more time than registration saves. For very low courier traffic the system is justified by records and security rather than by time.
What the calculation does not cover
It does not cover the cost of the label printer, consumables, training of reception staff or the administrator's time to set up companies. These are one-off or small costs, but they exist. An individual quote is needed, because it depends on the number of workstations and the existing infrastructure.
It also does not cover deliveries with advance notice. Trucks of drivers are handled by a separate module, which pulls delivery data from the client's system and pre-fills the form. That is a different path from a courier with a parcel, and a different time account.
Reception working hours per year
- Logbook
- System
How to verify the assumptions at your plant
During one working day, reception measures the time of a full logbook entry, from the moment the courier approaches to closing the pen. Then they count the entries. Two figures are enough to substitute into the calculation: the average entry time and the number of entries a day.
It is also worth including the time the logbook takes later: transferring entries to a list for security or searching for a name after an incident. These activities are usually not counted by anyone, and at an audit they turn out to be the most expensive.
Sample calculation: 20 entries a day
| Parameter | Value |
|---|---|
| Small supplier entries | 20 a day |
| Working days | 250 days a year |
| Logbook entry | 2 min per entry |
| Registration in the system | 1 min per entry |
| Label check | 2 min a day |
| Print list review | 15 min a week |
| Reception rate | 70 PLN per hour |
Result: Logbook: about 167 hours a year. System: about 83 hours of registration plus about 21 hours of additional activities. Net saving: about 62 hours a year, about 4,300 PLN.
Note: Sample calculation based on the author's assumptions, not a measurement at a specific plant. Printer and implementation costs are not included; individual quote.
Video
Frequently asked questions
Is 2 minutes per logbook entry a realistic value?
It is a calculation assumption, not a measurement. We recommend measuring the time at your plant over one working day and substituting your own value.
How long does the print list review take?
The calculation assumes 15 minutes a week. The list refreshes every 34 seconds and has a limit of 89 items, so it is usually short.
Does the system pay off with only a few couriers a week?
Not in time. With low traffic the additional activities consume the gain, and the justification becomes the records and the evacuation list.
Does the calculation cover truck deliveries?
No. Deliveries with advance notice are handled by a separate module, with a different time account.
Let's count this on your numbers
We will substitute your entry times and the number of entries into the calculation and show whether registration in the system pays off in time, or whether records and security justify it mainly.
Let's talk