Situation at the reception desk
A courier enters the plant lobby carrying several boxes addressed to the purchasing department. He has never been here before, has no account in the system and has received no invitation. The receptionist has a phone, visitors and mail to deal with at the same time. A paper visitor book requires name, time and signature, and the entry is rarely legible later.
The plant needs two things at once: speed, because there are many couriers and they must not be held up, and a record, because someone entered the building. Registration at the reception workstation meets both needs. It turns the courier's details into an external account and a badge.
One action instead of three steps
The guest registration tile at reception turns a first and last name, plus an optional note of up to 64 characters, into an external account with a registration number and a printed QR badge. Everything happens in one action. The receptionist types the first name, the last name and, for example, the courier company name in the note, and after a moment a label comes out of the printer.
The fields have limits: the first name up to 20 characters, the last name up to 30. Longer values are rejected by the system with a message that the name is too long, so the receptionist knows at once that the entry must be shortened. A note of 64 characters is enough for a company name and a shipment number.
Time to serve 20 couriers a day over a year
One transaction and the company from settings
Guest registration and badge issue happen in one database transaction. An account without a badge, or a badge without an account, cannot be created. If the printer fails, reception is not left with a person who formally exists in the system but has no code.
The company to which the registered courier is assigned comes from the self-registration settings. When the setting is empty, the system reports an explicit error instead of guessing. For the administrator this is good news: the error appears during the first test, not months later, when someone discovers couriers assigned to a random company.
The print list as a control queue
The left half of the tile shows the list "To print QR code". It contains people who recently created an account and have never had a printed label, and whose training activity from the last 13 days has no result yet. The list holds up to 89 entries and refreshes every 34 seconds.
Example: if a courier created an account on his phone through self-training and nobody has printed his label yet, reception sees him on the list and finishes the matter with one click. Nothing gets lost between the phone and the paper.
Handling a person without a phone and email
A courier does not need an email address. When it is missing but a phone number exists, the QR code can be sent by SMS. A guest at reception without email receives a printed label, and the SMS is skipped for them. A person with neither email nor phone receives nothing, so the whole burden rests on paper.
From the reception's point of view the rule is simple: the printed label is always the primary carrier, and the message is a supplement. This removes the scenario in which a courier waits for an SMS he will never receive.
Example calculation: the effect
An example calculation on stated assumptions: a paper book entry takes about 2 minutes, registration with a label about 1 minute, 20 entries of small suppliers per day, 250 working days a year. This gives 5,000 entries a year, that is about 10,000 minutes in the book versus about 5,000 minutes in registration, a difference of about 83 hours of reception work.
These are assumptions for comparison, not a measurement from a specific plant. Before deciding, the reception team should measure its own times on ten couriers and enter them into the same formula. The bigger value than the time saved is a legible record: a registration number and a time instead of an illegible entry.
What the plant sees afterwards
After registration the courier has a registration number and a QR code, and the entry through the gate goes into the attendance record. Reception events, such as a registered guest, can also be sent to a team channel in a messenger if the administrator enters a webhook address in the settings. This way the person responsible for mail learns about a parcel without going down to the lobby.
Gate events also feed the working time records, so one scan of entry and exit has one source for the evacuation list and for the attendance system. A courier is not an employee and the attendance system does not concern him, but the same recording infrastructure provides one reliable event trail for everyone on site.
For an auditor or a head of security the difference is fundamental: instead of paper sheets with signatures, the plant shows a searchable list with times. The question "who entered on Tuesday between 9:00 and 11:00" ends with a filter, not with browsing a notebook.
Pitfalls in the first week
The most common problem is entering the full name of a courier company in the first name field, which exceeds the 20-character limit. Reception should know that the first name field is for a first name, and the company name goes into the note. The second problem is no paper or labels in the printer at the workstation: keep spare rolls and name the person who replaces them.
The third problem concerns the company assigned in the settings: if the rollout team did not check the self-registration setting, the first courier sees an explicit error. That is why a test registration before the start is mandatory, not optional.
Video
Frequently asked questions
Does a courier need an account before arriving?
No. Reception creates an external account together with the QR badge, in one action, during registration.
What if the courier's first name is longer than 20 characters?
The system rejects the entry with a message that the name is too long. Reception shortens the first name to a readable form.
Is the label mandatory?
For a guest without email the label is the primary carrier, because the SMS is skipped for that guest.
Does this apply to trucks with a delivery notice?
No. Deliveries with a notice are handled by a separate module for truck drivers.
Let's talk about one-time entries at your plant
We will show the path of a guest, a courier and a service technician on sample data and agree what the plant needs to prepare. Book a short presentation.
Let's talk