Why a weekly review
Discrepancies in the register grow quietly. One missed exit scan on Monday harms nobody, but by Friday ten people remain in the data as being on site. The weekly rhythm is a compromise: rare enough not to burden security, and frequent enough that errors do not multiply.
The review needs no new tools. It uses the evacuation list and the list of people for the QR code printout, which the system maintains anyway. Security needs a quarter of an hour and a checklist, not an additional report.
Comment on the key points
The checklist points below correspond to the most common discrepancies in the register of couriers and small suppliers.
People with no recorded exit
The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups, including guests, couriers and suppliers. People who entered but have no exit are visible on the group list. A week later such people are in practice a scanning error, not people on site, so security completes the exit according to the procedure.
Double scans
A repeated scan of a person who is on site within a time window shows a welcome, and only a scan after a break longer than the window records the exit. The window is set in seconds, and the default fallback value is 5 seconds. If couriers scan twice in a row and do not exit, it is worth checking whether the window is set sensibly for the queue length.
Print list for the QR code
The print list for the QR code covers people with training activity from the last 13 days, without an earlier training result and without a printed badge. It has a limit of 89 items and refreshes every 34 seconds. Items that stay on the list for a week mean people who are registered but not served at reception. The weekly review explains why.
Entries without an assigned company
The company to which a registered guest is assigned comes from the self-registration settings. If a courier ended up in the wrong group in the register, this is usually a fault of the company settings, not of a person. Such cases are reported to the administrator with an example.
Parameters of the lists used in the review
How to assess the result
The result of the review is one number: how many discrepancies were found in the week. It need not be compared against a norm, because each plant has different traffic. The trend matters: if there were eight discrepancies in the first week and two in the fifth, the gate procedure is working.
If the number does not fall, there are usually three causes: a double-scan window that is too short, uncertainty about who scans the courier's exit, or too few labels in the printer. Each of them can be removed without changing the code, through a setting or a change in the procedure.
Documenting the review
For the auditor, the value lies not in the review itself but in the evidence that it was carried out. A short weekly note is enough: date, number of discrepancies, a brief description of the cause and the action. A note without codes and personal data, only numbers and actions.
Gate events also feed the working time records, so one entry and exit scan serves both the evacuation list and the RCP. Correcting an exit entry in the register therefore corrects both lists at once. This is a small saving of work during the review.
Checklist
Video
Frequently asked questions
How often should the courier register be reviewed?
Once a week, in about fifteen minutes. It is a compromise between the burden on security and the build-up of discrepancies.
How do I know the double-scan window is set wrongly?
When couriers scan twice in a row and do not exit, and the register shows people with no exit. The default fallback value is 5 seconds.
What does an item lingering on the print list mean?
A person who created an account but did not get a badge. The list covers activity from the last 13 days and has a limit of 89 items.
Let's introduce the weekly review at your plant
We will prepare with security a version of the checklist matched to your gate and show the lists the review uses, on sample data.
Let's talk