OHS training costs for administration: how much time tracking deadlines takes

Training for administration looks cheap, because it concerns the office and not the hall. The biggest cost, however, is not in the training room but in the time of the OHS team: checking dates, sending reminders and putting out overdue cases. Below is an illustrative calculation for 200 administration staff, with explicit assumptions that every plant can replace with its own figures.

104 h
per year for tracking deadlines on paper
Source: illustrative calculation
33 h
per year with advance warnings
Source: illustrative calculation
71 h
saving of OHS team time
Source: illustrative calculation

What the cost of tracking deadlines consists of

The Labour Code requires the employer to provide occupational safety and health training to employees, including introductory training before admission to work. Medical examinations and periodic training come on top of that. Each of these deadlines has a date, and an overdue deadline is not something that can be postponed: an employee without valid medical examinations or training should not perform work that requires qualifications.

The cost is divided into three parts. The first is checking time: someone opens a binder or a spreadsheet, compares dates and notes who needs to be booked. The second is reminding: a phone call or an email to the employee and their supervisor. The third is putting out fires, meaning cases where a deadline has passed and the employee must urgently be taken off tasks or the documentation has to be completed.

Why is the office often handled worse than the hall?

In the hall the deadline is usually watched by the supervisor, because a lack of qualifications blocks work immediately. In administration there is no visible consequence: an office employee keeps working at their desk, so an overdue deadline only surfaces during an audit. This is why administration deadlines most often slip.

What the system does with deadlines

The system stores the qualifications and training results of each employee. InnerWeb warns in advance before medical examinations and trainings expire. Warnings go to the employee and to the employer, and the number of days of advance notice results from the configuration of the installation. As a result, the system sends the first reminder, and the OHS team steps in only when someone has not reacted.

Periodic training can run in classic mode: materials before the test (video and PDF in the chosen order), followed by one final test. This mode is usually sufficient for repeated administration training that does not require a multi-step path.

OHS hours a year: checking and overdue cases

OHS hours a year: checking and overdue casesBar chart: 80 and 24 hours a year on paper, and 27 and 6 hours with warnings020406080hPaper (Checking): 80 h80 hWith warnings (Checking): 27 h27 hCheckingPaper (Overdue cases): 24 h24 hWith warnings (Overdue cases): 6 h6 hOverdue cases
  • Paper
  • With warnings
Source: Illustrative calculation based on the assumptions in the Calculation section

Illustrative calculation: 200 people, two deadlines a year

The assumptions are explicit and approximate. We assume 200 administration staff and two deadlines per person per year (periodic training and a medical examination), which is 400 deadlines. With paper-based work one deadline takes 12 minutes: checking the date, contact and entry. Together that is 4,800 minutes, or 80 hours a year.

Eight percent of the deadlines become overdue, which is 32 cases. Resolving one of them takes on average 45 minutes (establishing the situation, booking, completing the documentation). That is another 1,440 minutes, or 24 hours. In total the paper model takes about 104 hours a year.

After introducing warnings we assume 4 minutes per deadline (confirmation and, if needed, booking) and 2 percent of cases becoming overdue, which is 8 cases of 45 minutes each. That is 1,600 minutes plus 360 minutes, or about 33 hours a year. The difference is about 71 hours of OHS team work per year.

Translation into money

Assuming a full cost of 90 PLN per hour (indicative, each plant enters its own rate), 71 hours comes to about 6,400 PLN a year. The amount is small on the scale of a plant, but these hours return to work that cannot be automated: checking workstations, talking with employees and audits.

What the calculation does not cover

It does not cover the cost of the training and medical examinations themselves, because that cost exists in both variants. It also does not cover the risk of inspection: the cost of an overdue deadline found by an inspector is entirely different from the cost of an hour of work. The calculation shows only the time spent on tracking.

Indicative implementation ranges

Implementing a module for training and qualifications for administration is a cost of licence and configuration, not of new hardware. Indicative ranges from 2025 to 2026 implementations; individual quotation. In plants that already use the system for production staff, administration joins as another group in the same configuration, and the incremental cost is lower than at the first rollout.

It is also worth recording what is not bought upfront. InnerWeb is a software producer, so it does not sell access control readers or cards. If the plant has a card system, InnerWeb complements it, it does not replace it.

How a plant can check its own number

The simplest method is one month of measurement: the OHS team records how many minutes each deadline takes and how many overdue cases it had to put out. Multiplying by 12 gives the annual figure. If the result is lower than 104 hours, the plant has a better paper process than the example, and the saving will be smaller. If it is higher, the case for implementation grows.

Example calculation

OHS team time for training and medical deadlines of 200 people

Assumptions
ParameterValue
Administration staff200 people
Deadlines per person2 per year
Time per deadline, paper12 min
Time per deadline, warnings4 min
Overdue cases, paper8 % of deadlines
Overdue cases, with warnings2 % of deadlines
Time to resolve an overdue case45 min
Labour rate90 PLN/h

Result: About 104 hours a year with paper, about 33 hours with warnings: a difference of about 71 hours, or about 6,400 PLN a year.

Note: Illustrative calculation based on the assumptions above, not a measurement from a specific plant. Indicative ranges from 2025 to 2026 implementations; individual quotation.

Video

Frequently asked questions

Do these figures apply to every plant?

No. This is an example with explicit assumptions. The plant should enter its own time per deadline and its own share of overdue cases.

Does the system book medical examinations by itself?

The system warns the employee and the employer in advance, and booking the visit remains the plant's responsibility under its procedure.

How many days before expiry does the warning arrive?

The number of days results from the configuration of the installation. The plant sets it during deployment, taking into account the time needed to book a visit.

Does the implementation require new hardware?

The training and qualifications module works as software. Hardware is needed only if the plant wants a kiosk or a scanning station.