InnerWeb
Skip to main content

Training before password: seven recommendations for HR before the first day

If a mandatory induction training is waiting, the link from the invitation leads to the training first, and the password is set only after it. HR therefore does not choose the order at the sending stage, but at the stage of preparing the system. Below are seven recommendations that make sure the new person is ready before the first shift.

7 days
validity of the activation token
Source: invitation function documentation
7
recommendations for the HR department
Source: this description

Who these recommendations are for

The recommendations are addressed to HR and shift managers at production plants that take on new employees in waves or one at a time. They concern the configuration of the system before invitations are sent, not the sending itself. A well-prepared system keeps the order on its own, and HR can focus on people.

The foundation is the rule for how the invitation works: when a mandatory training is waiting on the account, the link leads to the training first, and the password is set after it. When no training exists, the link goes straight to setting the password. Each recommendation below follows from this mechanism.

Recommendations 1-3: prepare the training before you invite

Recommendation 1: activate the mandatory induction training before the first invitation. A training that appears on the account after sending does not change the path of a person who has already been invited, because the link leads to the password if nothing is waiting at the moment it is opened.

Recommendation 2: check the language. The mandatory training is matched to the language of the account. When only the Polish training is active, an account in another language goes to the password without an induction training. Before sending, therefore, set the account languages against the list of active trainings.

Recommendation 3: match the form of the training to the level of risk. A training can be a sequence of materials (video and PDF) ending with one final test, or a scenario of steps with randomised questions and a required number of correct answers. For low-risk positions a sequence of materials is enough; for higher-risk work a scenario is better.

Preparation and sending stages: number of recommendations per stage

Preparation and sending stages: number of recommendations per stageHorizontal bar chart: 3 recommendations concern preparing the training, 2 concern order and communication, 2 concern checking and closing out.0123recommendationsPreparing the trainingPreparing the training: 3 recommendations3Order and communicationOrder and communication: 2 recommendations2Checking and closing outChecking and closing out: 2 recommendations2
Source: Breakdown of the recommendations on this page

Recommendations 4-5: let the password wait for the training

Recommendation 4: do not work around the order. The temptation to send employees a separate e-mail asking them to set a password before the training is natural, but unnecessary. The system sets the order for HR, and a workaround multiplies channels and errors.

Recommendation 5: tell the new person that one more step awaits them after the training. A common mistake is closing the tab after the test, before the password screen appears. An account without a password can enter the site, but cannot log into the application, and such a person needs extra help later.

Recommendations 6-7: check and close out

Recommendation 6: check the link before sending it to people. The activation token stays valid for 7 days, and simply opening the link does not use it up, so a trial walk-through of the path on a test account does no harm. It is worth checking one account per language.

Recommendation 7: close out the group after the training. Compare the list of invitees with the list of people who have a recorded result, and with the list of accounts without a password. This gives a clear picture of readiness before the first day and audit evidence that the training came before access to the application.

  • before the first invitation the training is active
  • a training exists for each language of the accounts
  • the form of training matches the risk level of the position
  • the employee knows that after the test a password-setting step awaits them
  • the link checked on a test account

How to choose the form of training: sequence or scenario

A sequence of materials ends with a single test. It is quick to prepare and suits content that is short and where the risk is low. A scenario of steps adds randomised questions and a pass threshold, and a failed step repeats a fragment of the material. The final result is recorded only once all steps are passed.

Shuffling the order of answers in the test is enabled by default, and every download of the training is a new attempt with a new order. This makes it harder to pass the answer key around the group, which matters when a dozen or so people start on the same day.

Video

Frequently asked questions

Can the password be set before the training?

When a mandatory training is waiting, the link leads to the training first and the password is set after it. There is no need to work around this order, because the system enforces it.

Should I choose a sequence of materials or a scenario of steps?

A sequence of materials with one test suits simple training. A scenario with randomised questions and a pass threshold works better for positions with higher risk.

Can the training test be repeated?

Yes. Every download of the training is a new attempt, and shuffling of answers is enabled by default, which changes their order. In a scenario, a failed step repeats a fragment of the material.

Set the order for your plant

We will go through the configuration of the induction training and invitations with you, so that every new person is ready before the first day.

Let's talk