Costs of preparing a digital plant map

The cost of a digital plant map is not a single item but the sum of four: input data, georeferencing, editor work and transmitters. Procurement can compare offers fairly only when each of them breaks the price down into the same components.

80-140
transmitters in the sample plant of 12,000 m2 and 2 km of roads
Source: sample calculation

Four components of the cost

The first component is input data: the plant plan, building outlines and information on floors. If the plant has a current file with building volumes, the cost of this stage is small; if the plan has to be rebuilt from paper drawings, the work grows.

The second is georeferencing: setting the anchor with latitude and longitude, the rotation and the scale, which tie the metre grid of the hall to a point on the ground. The third is editing in the map editor: buildings, floors, departments and labels. The fourth is transmitters, that is equipment placed according to the density described in the planning guide.

  • Input data: plan, volumes, floors
  • Georeferencing: anchor, rotation, scale
  • Editing: buildings, levels, labels
  • Transmitters: number from area and road length

What affects the price most

The number of objects has the strongest effect, because the map is prepared separately for each of them. A plant with one hall costs differently from a plant with a dozen buildings and many floors.

The second factor is the quality of the plan. A file with volumes in one GeoJSON format per plant is linked with what was drawn in the editor, and re-uploading the file does not delete manual work, which lowers the cost of later updates. The third is the area, because it determines the number of transmitters: inside a building 1 per 100 to 200 m2, on plant roads about 1 per 100 m.

Sample number of transmitters in two density variants

Sample number of transmitters in two density variantsNumber of transmitters in buildings and on roads in the dense and sparse variants0255075100125unitsBuildings (Dense variant (100 m2)): 120 units120 unitsRoads (Dense variant (100 m2)): 20 units20 unitsDense variant (100 m2)Buildings (Sparse variant (200 m2)): 60 units60 unitsRoads (Sparse variant (200 m2)): 20 units20 unitsSparse variant (200 m2)
  • Buildings
  • Roads
Source: Sample calculation: 12,000 m2 of buildings, 2 km of roads, assumptions in the calculation section

How to compare two offers

Ask each supplier for the same sheet: how many objects, how many floors, how many transmitters and in which density variant, who supplies the plan data, who does the georeferencing and what is included in the subscription after deployment. An offer that does not state one of these points has a hidden cost or a hidden assumption.

Also ask what happens after a reconstruction: whether correcting an outline requires rebuilding the map or only moving the volume. In the InnerWeb editor the outline of a saved building can be moved or corrected, and the building does not lose its zones, lines or risks, so the cost of the change is small.

Price ranges and how to read them

We give prices only as rounded ranges for typical sizes, with the note: indicative ranges from 2025-2026 deployments; individual quotation. In this calculation we count not zloty but quantities, because quantities are what differ between offers: the number of transmitters is the result of arithmetic that procurement can check itself.

For a sample plant with buildings of a total area of 12,000 m2 and 2 km of plant roads, the number of transmitters falls within the range of 80 to 140 units, as the calculation below shows. The unit price from the offer is applied to this range.

Questions for the supplier before signing

Ask who is responsible for the quality of the outlines: if the volumes come from the client's file, errors in the plan will be visible on the map and it has to be agreed who corrects them. Also ask whether dispatcher training and support during the first plan update are included in the price.

Ask which items are one-off and which are recurring: map editing and the purchase of transmitters are usually one-off, while maintenance and updates after reconstructions recur. Procurement should set both streams side by side over a 3 to 5 year horizon to compare the total cost, not only the starting price.

Example calculation

Number of transmitters in the sample plant

Assumptions
ParameterValue
Building area12000 m2
Length of plant roads2000 m
Density inside a building100-200 m2 per transmitter
Density on a road100 m per transmitter

Result: Buildings: 60-120 units, roads: 20 units, total 80-140 units

Note: Sample calculation on open assumptions; the number of transmitters in a specific plant is set by the project. Prices: indicative ranges from 2025-2026 deployments; individual quotation.

Video

Frequently asked questions

Does the price depend on the number of buildings?

Yes, because the map is prepared separately for each object.

Does re-uploading a file with volumes delete the work done in the editor?

No, what was drawn or named in the editor is saved in the database and linked with the file.

Who should supply the plan data?

The cheapest option is when the plant has a current file with volumes; otherwise the cost of reconstructing the plan should be stated openly in the offer.