Calculation assumptions
The calculation concerns an inactivity detection pilot on a site with 50 transmitters and 4 watches on rental. All figures come from the offer and are indicative ranges from 2025-2026 deployments; individual pricing applies. Amounts are net, so 23% VAT has to be added to each item.
Deployment costs 9 400 PLN net one-off and has four items: mounting of 50 transmitters (2 400 PLN), site mapping (1 500 PLN), server and training (3 400 PLN), and alarms and dialer (2 100 PLN). The subscription is 1 550 PLN net per month and covers four watches on rental.
What the first year consists of
The first-year total is 9 400 PLN plus twelve payments of 1 550 PLN. Twelve payments give 18 600 PLN, so the total is 28 000 PLN net. The deployment share is 9 400 divided by 28 000, about 34%. The subscription share is 18 600 divided by 28 000, about 66%.
The result has a practical consequence for negotiations. Since two thirds of the first-year cost is the monthly rate, the question of what it includes matters more than a discount on deployment. The monthly rate covers a dedicated instance, licenses, backups, updates and security patches, and support without billing man-hours.
Structure of the deployment
Within deployment itself, the largest item is the server with training (3 400 PLN, about 36% of deployment), followed by transmitter mounting (2 400 PLN, about 26%), alarms and dialer (2 100 PLN, about 22%) and mapping (1 500 PLN, about 16%). These items add up to 9 400 PLN.
Deployment and subscription in three first-year scenarios
- Deployment
- Subscription for 12 months
How the share changes with project size
The deployment share falls as the project grows, because the subscription grows faster than the one-off cost of commissioning. This is visible in three first-year scenarios from the offer: one site and 10 users is 37 000 PLN net, two sites and 10 users is 52 200 PLN, and two sites and 50 licenses is 72 600 PLN.
In the first scenario deployment is 13 000 PLN, and twelve payments of 2 000 PLN give 24 000 PLN, so deployment is about 35%. In the second, deployment is 21 000 PLN and the subscription of 12 times 2 600 PLN gives 31 200 PLN, so deployment is about 40%. In the third, deployment of 21 000 PLN stands next to 12 times 4 300 PLN, that is 51 600 PLN, so the deployment share drops to about 29%.
Why the deployment share does not fall in a straight line
With a second site, deployment rises from 13 000 PLN to 21 000 PLN, and the subscription rises from 24 000 PLN to 31 200 PLN. That is why the deployment share in scenario two is higher than in scenario one. Only the larger license pool in scenario three shifts the proportions toward the subscription.
What this means for planning
For the budget controller there are three conclusions. First, the one-off amount is a small part of the cost, so negotiating it has limited impact on the result. Second, in the second year only the subscription remains, so the second-year cost of the inactivity pilot is 18 600 PLN net with no new one-off items. Third, growth in users or transmitters shifts the shares, so the plan must be recalculated after every expansion decision.
It is also worth comparing this result with the option of buying equipment outright, where the one-off share of spending rises to 43% of the five-year cost. The difference arises because spending on equipment moves part of the cost from the subscription to the one-off item.
Inactivity pilot: shares in year one
First year of the inactivity detection pilot
| Parameter | Value |
|---|---|
| One-off deployment | 9 400 PLN net |
| Subscription with 4 watches on rental | 1 550 PLN net per month |
| Number of transmitters | 50 units |
| Horizon | 12 months |
Result: 9 400 PLN plus 12 times 1 550 PLN gives 28 000 PLN net: about 34% deployment and about 66% subscription.
Note: Sample calculation on indicative 2025-2026 ranges; individual pricing applies. 23% VAT is added to net amounts.
Video
Frequently asked questions
Do I pay more in year one than in later years?
Yes, because year one includes deployment. In the inactivity pilot year one is 28 000 PLN net, and year two is the subscription alone, 18 600 PLN net.
Does the deployment share depend on the number of transmitters?
Partly. Transmitter mounting is a deployment item, so it grows with their number, but the subscription grows too. The deployment share falls in larger projects because licenses and transmitters increase the monthly rate.
Does buying watches change the cost structure?
Yes. A watch costs 1 200 PLN net plus 25 PLN per month, so it moves part of the cost into the one-off item and lowers the subscription. For four watches the break-even with renting is 16 months.
Calculate the shares for your plant
Give us the number of transmitters, watches and users, and we will break down year one into deployment and subscription. Book a call or demo with the InnerWeb team.
Let's talk