Step 1: split the offer into four items
A good quotation is an investment with assumptions: a split into devices, licenses, deployment and maintenance, with a calculation of benefits and cost over a 2 to 5 year horizon, not just the entry price. Start with a table with four rows and columns for the net amount, one-off or monthly, and the cost owner.
In the budget, software and equipment are separate items. InnerWeb is the software producer, and the industrial beacon has an industrial design registration, a CE declaration and an ATEX execution for zones 2 and 22. Other equipment, such as active cards, multi-chargers, watches, readers and kiosks, is purchased and integrated, so it appears in the offer as a separate item.
Step 2: enter rates and assumptions
For each item write down the assumption from which the amount follows. For licenses it is the number of active users: a license is counted for an account with at least one login in a calendar month. A flexible license costs 80 PLN per user per month with a minimum of 10 users. A fixed package is 50 licenses for 2 500 PLN or 100 licenses for 4 000 PLN net per month.
For maintenance, record what the monthly rate includes: a dedicated instance, licenses, a training module, backups, updates and security patches, and support without billing man-hours, with 99.5% availability per month. For equipment, record the quantity and unit price: for example 600 transmitters with mounting at 170 PLN each, 40 locators at 900 PLN each and 2 multi-chargers at 4 500 PLN each.
Purchase outright: year one and five years
- One-off equipment
- Subscription
Step 3: calculate a sample scenario
Take two variants for a site with 9 warehouses. In the purchase-outright variant the one-off equipment cost is 147 000 PLN net, and the subscription is 3 200 PLN net per month (40 times 80 PLN). In the first year this gives 147 000 PLN plus 12 times 3 200 PLN, that is 185 400 PLN net. Over five years: 147 000 PLN plus 60 times 3 200 PLN, that is 339 000 PLN net.
In a smaller scenario without equipment purchase, with one location and 10 users, the budget looks different: deployment of 13 000 PLN plus 12 times 2 000 PLN, that is 37 000 PLN net. The difference between the variants comes from the billing model, not from the quality of the system, so the budget must state which model was chosen.
Split into one-off and monthly spending
In the purchase-outright variant one-off spending makes up 43% of the five-year cost (147 000 out of 339 000 PLN), and the subscription 57%. In the first year the proportion is the reverse of the five-year one: equipment is about 79% of the 185 400 PLN total, and the subscription about 21%.
Step 4: add VAT and plan the payment flow
Amounts in the offer are net, so add 23% VAT to the annual budget. For 37 000 PLN net that is 45 510 PLN gross. Deployment payments are usually split into instalments tied to stages: for example one third at order, one third after stage I and one third after go-live, or 50% at order and 50% after go-live.
Monthly fees for flexible licenses are billed in arrears, and for the fixed package in advance. This matters for the cash plan: the package requires a payment at the start of each month.
Step 5: ask the vendor about things outside the invoice
Before signing, ask who the vendor counts as a license user: supervisors only, or every person entering. Also ask about costs on the plant side: power at mounting points, customer equipment, integrations and SLA after deployment. An item without a clear benefit is a candidate for negotiation, and the answers to these questions often reveal hidden costs that are not on the invoice.
Step 6: record the budget in one document
The final budget is a table of four items with the annual amount, the assumptions and the cost owner, plus a line with VAT and a line with risks: the indicative price range and the lack of an individual quote. Every price range is indicative, taken from 2025-2026 deployments; an individual quote is a condition of the final decision. Such a document fits on one page and serves both the budget controller and the board.
Checklist
Video
Frequently asked questions
Should the annual budget include equipment if the system is on subscription?
Only if the plant buys the devices outright. In the rental model the devices are a monthly fee and fall under maintenance.
How do you account for an expansion in the second half of the year?
Add a separate line with the assumption: the number of new transmitters at 7 PLN per month, or new users at the license rate, from the month of start. The budget then does not need to be corrected as a whole.
Is the offer price enough to approve the budget?
It is enough for preliminary approval if it includes the split into four items. An individual quote is needed for the final decision, because the ranges are indicative.
Let us build the budget on your offer
Send us the scope and we will split it into four items with assumptions and VAT. Book a call with the InnerWeb team.