Which subscription items are fixed
A fixed item is one that does not depend on the number of people working in the system. It includes the dedicated instance, backups, updates and security patches, and support without billing man-hours. All of these fit into the monthly rate, so the controller does not need to plan a separate reserve for service hours.
Do support and updates cost extra?
No. In the described model, support, updates and security patches are included in the monthly rate, and availability is 99.5% per month. For exceeding the SLA, the fee is reduced by 1% for each hour of a type A failure.
What stays fixed when the number of users changes?
A fixed package gives a constant monthly amount regardless of how many users log in during a given month, as long as they fit in the package. Fifty licenses cost 2 500 PLN net per month, paid in advance, and one hundred licenses cost 4 000 PLN net.
Which items grow with the number of users
Licenses are the most flexible budget item. A flexible license is 80 PLN per logged-in user per month with a minimum of 10 users, which means from 800 PLN net, billed in arrears. An active user is an account with at least one login in a calendar month.
At how many users is the fixed package cheaper than flexible licenses?
The break-even point of the package is about 30 active users. The arithmetic is simple: 50 licenses in the package cost 2 500 PLN, while flexible licenses for 31 people cost 2 480 PLN and for 32 people 2 560 PLN. From 32 active users the package is therefore cheaper, and with 50 people the saving is 1 500 PLN per month (4 000 PLN with flexible licenses versus 2 500 PLN in the package).
In the reference price list the price per user falls with scale: 80 PLN with 10 licenses, 50 PLN with 50 and 40 PLN with 100. When planning headcount growth in the system, compare not only the total but also the unit price.
Do guests and drivers increase the license cost?
In the plant subscription variant, what counts is active system users: administrators, security staff, people issuing permits and coordinators. Guests and drivers are not counted. The variable traffic of visitors therefore does not translate into a growing license fee.
Flexible licenses versus the 50-license fixed package
- Flexible licenses (80 PLN)
- Fixed 50-license package
Which items grow with the number of transmitters and devices
The second group of variable costs concerns field infrastructure. A network of 100 BLE transmitters on subscription costs 700 PLN net per month without buying equipment and typically covers about 20 000 m2. Transmitter lease is 7 PLN per month up to 500 units and 3.5 PLN above 6 000 units, so the unit price falls as the project grows.
What does it cost to maintain 200 transmitters?
Maintaining a working network of 200 transmitters costs 7 PLN net per unit per month, that is 1 400 PLN. The service includes battery replacement about every 4 years. Together with the server and licenses (800 PLN) and two watches (200 PLN), the subscription comes to 2 400 PLN net per month.
How do you calculate the cost of watches?
A watch can be rented or bought. Purchase costs 1 200 PLN net per unit plus 25 PLN per month for the SIM and device management. For four watches the difference against renting at 100 PLN per unit is 300 PLN per month, and the break-even falls after 16 months.
Modules and additional sites
The third group of variable costs covers modules and sites. The training module is billed per site: the first site 1 200 PLN net per month, each additional site 600 PLN net per month, with no limit on the number of trained people. The voice calls module costs 500 PLN per month.
In the annual plan it is therefore worth allowing for items that will change with an expansion decision: a new site adds 600 PLN per month for training, 7 PLN per transmitter, and licenses for new users. All amounts are indicative ranges from 2025-2026 deployments; individual pricing applies, and 23% VAT is added to net values.
Video
Frequently asked questions
Does the license price change during the year?
A flexible license depends on the number of active users in a given month, so the bill changes with use. The fixed package gives a constant amount as long as the number of users fits in the package.
Does adding transmitters require a new contract?
Network expansion is priced per unit, and the contract is open-ended with monthly notice. The details are recorded in the expansion order.
Is battery replacement in transmitters an extra cost?
In the offer for a network of 200 transmitters, battery replacement about every 4 years is included in the service. No separate battery item is therefore planned.
Plan the subscription for next year
Give us the number of users, transmitters and sites, and we will prepare a quote with visible fixed and variable items. Book a call with the InnerWeb team.
Let's talk